Laserfiche WebLink
• <br /> L <br /> O <br /> 1.45. 7 6 63 Geologic Dill <br /> cTu <br /> Eaplaratiothh._ <br /> GEOTECH SOIL BORING REPORT <br /> Construction & Decommission <br /> O <br /> O <br /> co Notice of Intent# SE 45278 <br /> Decommission# AE 17415 <br /> O <br /> c Property Owner: Clinton Siedenburg <br /> Site Address: 1434 Grand Ave Everett <br /> Location: SE, SE, SEC 18,T29N, R5E <br /> County Snohomish County <br /> O Work/Decom Date: 5/8/12 <br /> = Date Completed 5/11/12 <br /> Consulting Firm Geotech Consultants <br /> +u Drilling Company Geologic Drill Exploration, Inc <br /> tCl Q Driller& License# Are Hansen 3123 <br /> Signature <br /> s <br /> > <br /> 03 <br /> 03 Construction: <br /> s- Procedure Hollow Stem Auger <br /> Auger Size 6" <br /> Boring Depth See below <br /> OWater Level NA <br /> Formation Description: Borings#B-1,2, • <br /> t/J <br /> O <br /> O B-1 0'to 15' Sand/Gravel <br /> 15 to 20 Till <br /> 0 <br /> 8-2 0'to 15' Sand/Gravel <br /> 0 <br /> 0 <br /> w <br /> O Decommission <br /> �-' Backfilled with Bentonite <br /> a) <br /> E <br /> a.+ <br /> ci <br /> ❑ <br /> a) <br /> I— <br /> I <br />