My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 KROMER AVE 2019-06-25
>
Address Records
>
KROMER AVE
>
3214
>
3214 KROMER AVE 2019-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 7:37:57 AM
Creation date
6/25/2019 7:37:51 AM
Metadata
Fields
Template:
Address Document
Street Name
KROMER AVE
Street Number
3214
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/20/2019 Page 1 <br /> City of Everett <br /> 9:00:24AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1711-005 Site Address 3214 KROMER AVE <br /> Applied 11/21/2017 Applicant Lot <br /> Approved 1/17/2018 Owner MILLER ALAN/GLEN W Block <br /> Issued 1/18/2018 Contractor OWNER Tract <br /> Parent Permit No. D1705-002 Description NEW SFR <br /> Notes **NORTH SIDE OF PROPERTY CORNERS MUST REMAIN STAKED TO VERIFY SETBACK OF <br /> GARAGE HAS NOT ENCROACHED INTO SIDE 5-FOOT SETBACK** <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 5/15/2018 5/15/2018 BLDG DWF APPROVAL See notes Contractor verified set backs.Contractor <br /> 02-FOOTING/SETB installed UFER ground. <br /> 5/15/2018 5/15/2018 BLDG 04-UFER DWF APPROVAL <br /> GROUND <br /> 5/18/2018 5/18/2018 BLDG DWF APPROVAL OK for concrete <br /> 03-FOUNDATION <br /> 7/11/2018 7/11/2018 BLDG DWF APPROVAL <br /> 07-EXTERIOR <br /> 7/30/2018 7/30/2018 PLUMB 05-OTHER SDP APPROVAL As noted Water service-ok to cover use tracor wire. <br /> Traceor wire:insulated copper,min 18 <br /> guage,color blue. <br /> 8/1/2018 8/1/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 10/19/2018 10/19/2018 BLDG DWF CORRECTION Not ready,Need <br /> 08-FRAMING elect and mechanical <br /> 10/26/2018 10/26/2018 MECH 04-ROUGH SDP APPROVAL As noted Dryer and stove exhaust will be on outside <br /> IN walls-will inspect at final. <br /> 10/29/2018 10/29/2018 BLDG DWF CORRECTION Complete shear nailing per plans- <br /> 08-FRAMING garage/house <br /> Strap top plate cut out over 50%. <br /> Install nails in 6x6"bracket-basement. <br /> Install bracing for trusses&post/beam <br /> connection-straps. <br /> Note:post temp site address per R319.1 <br /> OK to insulate. <br /> Will inspection above on insulation <br /> inspection. <br /> 11/1/2018 11/1/2018 BLDG DWF APPROVAL Complete nailing <br /> 08-FRAMING seismic straps <br /> 11/1/2018 11/1/2018 BLDG DWF APPROVAL <br /> 10-INTERIOR <br /> 11/1/2018 11/1/2018 BLDG DWF PARTIAL APPR Provide insulation certification and blower <br /> 11-INSULATION door test at building final. <br /> 11/2/2018 11/2/2018 GAS 01-ROUGH IN SDP APPROVAL <br /> 11/9/2018 11/9/2018 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 5/13/2019 5/13/2019 MECH 06-FINAL SDP APPROVAL <br /> 5/13/2019 5/13/2019 PLUMB 06-FINAL SDP APPROVAL <br /> 5/13/2019 5/13/2019 GAS 03-FINAL SDP APPROVAL <br /> 5/15/2019 5/15/2019 BLDG 15-FINAL DWF APPROVAL provided blower <br /> door paperwork <br /> 5/15/2019 5/15/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 5/17/2019 5/17/2019 CERTIFICATE OF CRB APPROVAL <br /> OCCUPANCY <br /> INSP12MIMI'SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.