Laserfiche WebLink
5/20/2019 Page 1 <br /> City of Everett <br /> 9:00:24AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1711-005 Site Address 3214 KROMER AVE <br /> Applied 11/21/2017 Applicant Lot <br /> Approved 1/17/2018 Owner MILLER ALAN/GLEN W Block <br /> Issued 1/18/2018 Contractor OWNER Tract <br /> Parent Permit No. D1705-002 Description NEW SFR <br /> Notes **NORTH SIDE OF PROPERTY CORNERS MUST REMAIN STAKED TO VERIFY SETBACK OF <br /> GARAGE HAS NOT ENCROACHED INTO SIDE 5-FOOT SETBACK** <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 5/15/2018 5/15/2018 BLDG DWF APPROVAL See notes Contractor verified set backs.Contractor <br /> 02-FOOTING/SETB installed UFER ground. <br /> 5/15/2018 5/15/2018 BLDG 04-UFER DWF APPROVAL <br /> GROUND <br /> 5/18/2018 5/18/2018 BLDG DWF APPROVAL OK for concrete <br /> 03-FOUNDATION <br /> 7/11/2018 7/11/2018 BLDG DWF APPROVAL <br /> 07-EXTERIOR <br /> 7/30/2018 7/30/2018 PLUMB 05-OTHER SDP APPROVAL As noted Water service-ok to cover use tracor wire. <br /> Traceor wire:insulated copper,min 18 <br /> guage,color blue. <br /> 8/1/2018 8/1/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 10/19/2018 10/19/2018 BLDG DWF CORRECTION Not ready,Need <br /> 08-FRAMING elect and mechanical <br /> 10/26/2018 10/26/2018 MECH 04-ROUGH SDP APPROVAL As noted Dryer and stove exhaust will be on outside <br /> IN walls-will inspect at final. <br /> 10/29/2018 10/29/2018 BLDG DWF CORRECTION Complete shear nailing per plans- <br /> 08-FRAMING garage/house <br /> Strap top plate cut out over 50%. <br /> Install nails in 6x6"bracket-basement. <br /> Install bracing for trusses&post/beam <br /> connection-straps. <br /> Note:post temp site address per R319.1 <br /> OK to insulate. <br /> Will inspection above on insulation <br /> inspection. <br /> 11/1/2018 11/1/2018 BLDG DWF APPROVAL Complete nailing <br /> 08-FRAMING seismic straps <br /> 11/1/2018 11/1/2018 BLDG DWF APPROVAL <br /> 10-INTERIOR <br /> 11/1/2018 11/1/2018 BLDG DWF PARTIAL APPR Provide insulation certification and blower <br /> 11-INSULATION door test at building final. <br /> 11/2/2018 11/2/2018 GAS 01-ROUGH IN SDP APPROVAL <br /> 11/9/2018 11/9/2018 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 5/13/2019 5/13/2019 MECH 06-FINAL SDP APPROVAL <br /> 5/13/2019 5/13/2019 PLUMB 06-FINAL SDP APPROVAL <br /> 5/13/2019 5/13/2019 GAS 03-FINAL SDP APPROVAL <br /> 5/15/2019 5/15/2019 BLDG 15-FINAL DWF APPROVAL provided blower <br /> door paperwork <br /> 5/15/2019 5/15/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 5/17/2019 5/17/2019 CERTIFICATE OF CRB APPROVAL <br /> OCCUPANCY <br /> INSP12MIMI'SYSTEMS <br />