Laserfiche WebLink
PUBLIC L7RKE • <br /> BUILDING ENCLOSURE RESIDENTIAL SUBMITTAL CHECKLIST <br /> EXEMPT BUILDINGS: Non-residential buildings, hotels, motels, dormitories, care facilities, floating homes, <br /> mixed-use buildings with maximum of two residential attached dwelling units, duplexes, and townhouses(as <br /> defined by the IRC)where each unit is on a single platted lot(approved and recorded zero lot line <br /> subdivisions). <br /> PERMIT AND CERTIFICATE OF OCCUPANCY SUBMITTAL REQUIREMENTS <br /> 1. A letter from the applicant certifying that the cost of,the construction work on the <br /> building enclosure is equal to or less than 5% of the assessed building value*, in <br /> addition to the building permit application and two sets of construction plans; or, <br /> 2. A certified recorded copy of the "Sale Prohibition Covenant" per RCW 64.55 in addition <br /> to the building permit application and two sets of construction plans; or, <br /> 3. Two complete sets of construction plans (per the building permit application submittal <br /> for 'New Commercial and Multi-Family', `Tenant Improvement', or `Residential'which <br /> meet WA State RCW 64.55 requirements for building enclosure certifications; <br /> Maximum size of plan sets: 42" long, 30"wide (bound edge), 5/8" thick. All pages in a <br /> plan set shall be uniformly sized <br /> 4. Completed Permit Application; <br /> 5. Plan check fee as applicable; and, <br /> 6. All documents must be clearly legible for microfilming <br /> NOTE-Applications are accepted between the hours of 8:00 AM and 4:00 PM only. <br /> *Internet reference for assessed building value, subject to change and verification of single building <br /> value: https://www.snoco.orq/proptax/(bzlfi545nzaxugzcclfkvn55)/search.aspx <br /> The City of Everett will not review or approve plans or inspect the work required by RCW 64.55, but will collect <br /> the required submittals for RCW 64.55 as noted on this checklist. <br /> I. REQUIRED PRIOR TO ISSUING A BUILDING PERMIT <br /> A. The building enclosure design documents submitted for permit should include details and <br /> specifications to protect the building or its components from water or moisture intrusion, <br /> including details of flashing, intersections at roof, eaves or parapets, means of drainage, <br /> water-resistive membrane, and details around openings. These documents should be <br /> submitted prior to the start of new construction or rehabilitative construction. <br /> B. Building enclosure design documents must contain a stamped statement by the Washington <br /> State licensed architect or engineer in substantially the following form: "The undersigned has <br /> provided building enclosure documents that in my professional judgment are appropriate to <br /> satisfy the requirements of RCW 64.55.005 through 64.55.090." <br /> II. REQUIRED PRIOR TO SCHEDULING FINAL INSPECTION <br /> A. A qualified inspector(a special inspector retained by the owner at their cost) shall prepare and <br /> • submit a signed letter certifying to the City of Everett Building Department Building Official that <br /> the building enclosure has been inspected during the course of construction or rehabilitative <br /> construction and that it has been constructed in substantial compliance with the submitted <br /> building enclosure design documents. <br /> APPLICABLE CODES AND REFERENCES <br /> • Chapter 64.55 RCW Construction Defect Disputes-Multiunit Residential Buildings, effective date <br /> 8/01/2005. Internet reference: http://apps.leq.wa.gov/RCW/default.aspx?cite=64.55 <br /> • Chapter 64.34 RCW Washington Condominium Act <br /> Chklst-RCW 64_55(rev 8/16) <br /> CITY OF EVERETT PERMIT SERVICES 3200 CEDAR ST, EVERETT, WA 98201 425-257-8810 <br /> website:www.everettwa.gov/permit email: everetteps@everettwa.gov <br />