My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2412 MAPLE ST 2019-06-25
>
Address Records
>
MAPLE ST
>
2412
>
2412 MAPLE ST 2019-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 9:58:17 AM
Creation date
6/25/2019 9:57:49 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2412
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/16/2019 City of Everett _-Page <br /> 10:53:46AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. CW 1710-002 Site Address 2412 MAPLE ST <br /> Applied 10/13/2017 Applicant Lot <br /> Approved 2/26/2018 Owner ROSENBERG MARILYN A Block <br /> Issued 2/27/2018 Contractor OWNER Tract <br /> Parent Permit No. W1707-009 Description NEW DADU <br /> Notes CONVERTED GARAGE INTO A DADU <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 3/16/2018 3/16/2018 BLDG DWF PARTIAL APPR Footings and wall-OK to pour concrete <br /> 02-FOOTING/SETB <br /> 3/16/2018 3/16/2018 BLDG DWF PARTIAL APPR Footings&wall OK to pour concrete <br /> 03-FOUNDATION <br /> 3/16/2018 3/16/2018 BLDG 04-UFER DWF PARTIAL APPR UFER installed <br /> GROUND <br /> 4/25/2018 4/25/2018 BLDG DWF CORRECTION Not ready-phone call <br /> 08-FRAMING Need Electrical,Mechanical and Plumbing <br /> rough ins before framing inspection. <br /> 5/24/2018 5/24/2018 PLUMB SDP OTHER Discussed methods and materials.Left <br /> 01-CONSULTATIO drawing. <br /> 6/1/2018 6/1/2018 BLDG DWF CORRECTION Not ready <br /> 08-FRAMING <br /> 6/6/2018 6/6/2018 PLUMB SDP APPROVAL As noted Called in on PW 1802-023. <br /> 03-ROUGH IN Rough in plumbing OK as noted: <br /> 1.Secure the hose bib piping in the wall or <br /> loop the pex.You must be able to replace <br /> the hose bib in the future without opening <br /> the walls. <br /> 2.At final-The temp/pressure drain line <br /> will terminate outside between 24"-6" <br /> above ground pointing down. <br /> 6/18/2018 6/18/2018 BLDG DWF OTHER Cancelled per phone <br /> 08-FRAMING call 10:18a <br /> 6/27/2018 6/27/2018 BLDG DWF APPROVAL As noted OK to insulate. <br /> 08-FRAMING Contractor to seismic strap top plate-cut <br /> outs over 50%bathroom walls. <br /> Still need exterior shear nailing inspected <br /> when ready. <br /> 7/2/2018 7/2/2018 BLDG DWF APPROVAL As noted Contractor to install nailing as per <br /> 07-EXTERIOR 6"-O.C.E.shear schedule 12"O.C.F. <br /> Over 1/8"depth need to be renailed <br /> 7/5/2018 7/5/2018 BLDG DWF PARTIAL APPR Insulation OK to cover(interior walls) <br /> 11-INSULATION Note:Exterior walls(west and north sides) <br /> still not ready. <br /> 7/9/2018 7/9/2018 BLDG DWF APPROVAL Exterior insulation wall OK to cover <br /> 11-INSULATION (siding). <br /> 7/20/2018 7/20/2018 BLDG DWF CORRECTION Bathroom ceiling:If use"green board"1" <br /> 09-DRYWALL OC-5/8"minimum span.Rest of interior <br /> OK to cover with mud and tape. <br /> 7/24/2018 7/24/2018 BLDG DWF APPROVAL OK to mud/tape <br /> 09-DRYWALL <br /> 8/30/2018 8/30/2018 PLUMB 06-FINAL SDP APPROVAL <br /> 8/30/2018 8/30/2018 BLDG 14-FINAL DWF CORRECTION Need electrical final before building final <br /> inspection. <br /> 8/31/2018 8/31/2018 BLDG 14-FINAL TMB CORRECTION OK for TCO of the ADU subject to the <br /> completion and approval of corrections to <br /> the main house of record. <br /> 1/18/2019 1/18/2019 BLDG 14-FINAL TMB APPROVAL <br /> 1/18/2019 1/18/2019 ADMIN OTHER TMB OTHER Corrections and abatement of code <br /> violations of record or completed. <br /> OK to occupy these structures. <br /> INSP12 CRWS YS TEM5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.