Laserfiche WebLink
. <br /> • <br /> • Evaluate the compaction of the building subgrade by hand probing • <br /> • Verify that base rock was placed beneath the building <br /> • Verify that a vapor barrier was installed beneath the building <br /> Members of our geotechnical staff observed the geotechnical-related tasks identified above on an <br /> intermittent and on-call basis. Their observations are summarized in field reports, which were <br /> provided to the design and construction team members and are on file in our office. <br /> To the extent observed, the construction outlined above was completed in general conformance <br /> with the intent of the project plans, specifications, and our geotechnical engineering <br /> recommendations. <br /> ♦ ♦ ♦ <br /> We appreciate the opportunity to work with you on this project. Please call if you have questions <br /> concerning the information provided. <br /> Sincerely, <br /> GeoDesign, Inc. 0C3� •wAsrr <br /> '? 4 tSP <br /> I <br /> xax . <br /> Ryan T. Lawrence, P.E. (Oregon) <br /> 4,26403 <br /> Senior Project Engineer 4 .tsxlwO' , <br /> SS4 NAL ,1 <br /> Signed 08/23/2017 <br /> Scott V. Mills, P.E. <br /> Principal Engineer <br /> cc: Nick Abdelnour, Polygon Northwest Company(via email only) <br /> Ron Bowen, Polygon Northwest Company(via email only) <br /> RTL:SVM:kt <br /> One copy submitted(via email only) <br /> Document ID:Polygon-128-03-082317-geol-compliance_BIdg_l.docx <br /> ©2017 GeoDesign,Inc. All rights reserved. <br /> GEODESIGN= Polygon 12803:082317 <br />