My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD WHOLE SITE FILE 2019-06-25
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
WHOLE SITE FILE
>
3400 RIVERFRONT BLVD WHOLE SITE FILE 2019-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 12:07:52 PM
Creation date
6/25/2019 12:07:14 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' / <br /> NINDESIGNv <br /> August 23, 2017 <br /> Polygon Northwest Company <br /> 11624 SE 5th Street, Suite 200 <br /> Bellevue, WA 98005 <br /> Attention: Michelle Dittman <br /> Building 2 Summary Letter <br /> Geotechnical Construction Observation Services <br /> Everett Riverfront Eclipse Site <br /> Everett, Washington <br /> GeoDesign Project: Polygon-128-03 <br /> 3301 31St Drive(Permit No. C1604-020) <br /> 3303 31St Drive (Permit No. C1604-021) <br /> 3305 31St Drive (Permit No. C1604-022) <br /> 3307 31St Drive (Permit No. C1604-023) <br /> 3309 31St.Drive (Permit No. C1604-024) <br /> 3311 31" Drive (Permit No. C1604-025) <br /> This letter provides a summary of GeoDesign, Inc.'s geotechnical construction observation <br /> services for Building 2 of the Everett Riverfront Eclipse Site in Everett,Washington. GeoDesign <br /> prepared a geotechnical report for this project' that summarized the site conditions and <br /> provided our geotechnical recommendations. We received a set of building construction plans <br /> for the project that were prepared by Core Design and dated July 2015. <br /> Members of our geotechnical staff visited the site on a periodic basis between May 2015 and <br /> March 2017 to perform the following tasks: <br /> • Observe the placement of structural fill and evaluate the compaction of the fill by conducting <br /> in situ density and moisture content measurements and by observing proof rolling <br /> • Observe the placement of surcharge material and install settlement markers <br /> • Monitor the surcharge settlement <br /> 'GeoDesign,Inc.,2017. Report of Geotechnical Engineering Services;Everett Riverfront Eclipse Site;Everett, Washington, <br /> dated March 16,2017. GeoDesign Project: Polygon-128-01 <br /> 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 www.geodesigninc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.