Laserfiche WebLink
ospEC nays, <br /> SofniI <br /> 14_64 <br /> Date 9-29-17 <br /> Eddy Stevens <br /> Risigr Front/Eclipse ,LLC <br /> P 0 Box 1349 Bellevue, WA 98009 <br /> RF:! Final Letter for Building 4 <br /> 11 River Front/Eclipse <br /> St Address 3325,3327,3329,3331,3333,and 3335, 31st Drive <br /> Our Job NO 20172281 <br /> Based on our periodic inspections, it appears that the interior and Exterior Shear,Frame, <br /> Building Wrap,Window Wrap,Lateral Bracing,Roof and Exterior Final for Building 6 at <br /> Rit rfront/Eclipse is in substantial compliance with the approved drawings(based on plans <br /> prpared by Milbrandt Architects dated January 20,2016) <br /> If you have any questions or additional information,please contact me at this office. Thank you. <br /> ' pectfully, <br /> Frstik Mellas <br /> C$rtified Building Official#819243 <br /> Certified Building Inspector#819243 <br /> cq Ron Smith Polygon Homes <br /> Michelle Dittman <br /> SOUND INSPECTIONS, LLC <br /> P 0 Box 44186 <br /> Tacoma,WA 98448 - 3)606-9559 <br /> L/ <br />