Laserfiche WebLink
• Evaluate the compaction of the base rock beneath the building <br /> • Verify that a vapor barrier was installed beneath the building <br /> Members of our geotechnical staff observed the geotechnical-related tasks identified above on an <br /> intermittent and on-call basis. Their observations are summarized in field reports, which were <br /> provided to the design and construction team members and are on file in our office. <br /> To the extent observed, the construction outlined above was completed in general conformance <br /> with the intent of the project plans, specifications, and our geotechnical engineering <br /> recommendations. <br /> ♦ ♦ ♦ <br /> We appreciate the opportunity to work with you on this project. Please call if you have questions <br /> concerning the information provided. <br /> Sincerely, <br /> ,Sf V. , <br /> GeoDesign, Inc. GO of <br /> WA <br /> GeoDesign, Lit e <br /> Ryan T. Lawrence, P.E. (Oregon) k26403 4,' <br /> Senior Project Engineer 4c,rst-t <br /> ss/0NAL <br /> Signed 10/13/2017 <br /> Scott V. Mills, P.E. <br /> Principal Engineer <br /> cc: Nick Abdelnour, Polygon Northwest Company(via email only) <br /> Ron Bowen, Polygon Northwest Company(via email only) <br /> RTL:SVM:kt <br /> One copy submitted(via email only) <br /> Document ID:Polygon-128-03-101317-geol-compliance_Bldg_9.docx <br /> ©2017 GeoDesign,Inc. All rights reserved. <br /> GEODESIGN` .---� <br /> 2 Polygon-128-03:101317 <br />