My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD WHOLE SITE FILE 2019-06-25
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
WHOLE SITE FILE
>
3400 RIVERFRONT BLVD WHOLE SITE FILE 2019-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 12:07:52 PM
Creation date
6/25/2019 12:07:14 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'" <br /> Otto Rosenau&Associates <br /> Reinforcing Steel Inspection Report 6747 M. L. King Way S., <br /> Seattle,WA 98118 <br /> 206-725-4600 <br /> Inspection Details <br /> Report Number Permit Number Job Number <br /> 366472 SEE NOTES 16-0804 fa ra3,„ <br /> Inspector Name Date <br /> ��- I z <br /> John Fraser 02/13/2018 <br /> Project Address <br /> Eclipse Townhomes-All Buildings 3300 Eclipse Mill Road, Everett <br /> Start Time Finish Time <br /> 06:00 AM 07:30 <br /> Description <br /> Grade Manufacturer Type of Bar Is SDQ steel required? <br /> 60 Nucor A-615 No <br /> Inspection Notes and Conformance <br /> Structural Elements/Location/Gridlines <br /> On site for ORA at contractor's request for inspection of re-steel placement. Inspection covers the requirements for material I.D., <br /> location, size and condition of reinforcing steel. Placement criteria found in ACI 318, and approved costruction documents. <br /> The following inspections were performed for this location: <br /> Inspected placement of reinforcing steel 4 perimeter footings and structural slab within grids A to C, and 1 to 7 <br /> -Hold-downs verified tied to reinforcing steel <br /> -(7)"UFER"grounds installation verified <br /> Ref: Milbrandt architects job 13-47 <br /> Sheet F17 and associated details <br /> All structural elements have proper clearance from earthwork/forms, and have been secured for concrete placement. <br /> This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau&Associates, Inc. <br /> Reproduction of this report, except in full,without written permission from our firm is strictly prohibited. <br /> powered byg3canvas ww '?f"x3YtVs3 com. '.;,..' E ".s x.;f:C <br />
The URL can be used to link to this page
Your browser does not support the video tag.