Laserfiche WebLink
INSPECTION REPORT <br /> s Date`ItiJ1TL Permit:6 1k,,a\O- O '‘ <br /> Contractor: \`'Ve-"C'"Q.-°C`C'e-C\ t`-QGk°(k �. <br /> c•.. t. Owner: '�•_ f p-, <br /> Site Address:1,b0...- 0LW' '$, WC <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding E]Insulation El Mechanical Final ❑Medical Gas <br /> ❑ ening Grid ❑Drywall Nailing EJ Plumbing Final <br /> CE#ectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THI R <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED '�' <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: L / Date: iff i 7 / 2 <br /> _ _.„,, <br /> EIR(10/06) DATABAR,INC. <br />