Laserfiche WebLink
INSPECTION REPORT <br /> i' ',;M Nrmiri <br /> Date_ 0Permit: b--17& /0 .Its <br /> if„ _ _,_C Contractor: 7lQ7Q/-reC� GC. ` <br /> 5-(� Owner: -WW/i---(5 <br /> Site Address:2-eaZ- ►":� e a - <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:__ _ -- — -- --- <br /> jam 'PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> II OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> ne___ q_cy,..tr„,,J....„ ti__) <br /> . - - <br /> /- <br /> ___,A ..Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />