Laserfiche WebLink
APPENDIX A <br /> BORING LOGS FROM PREVIOUS STUDIES <br /> Included in this section are logs from previous studies completed in the immediate vicinity of the project <br /> site. <br /> ■ The logs of nine test pits(TP-1 through TP-9)completed by GeoEngineers in 2012 for the Central Utility <br /> Plant Parking Lot project; <br /> ■ The logs of 10 borings (GEI-1 through GEI-4, GEI-5a, GEI-5b, and GEI-6 through GEI-9) completed by <br /> GeoEngineers in 2007 and 2008 for the Central Utility Plant project; <br /> ■ The logs of one boring(B-2)completed by GeoEngineers in 2006 for the Acute Care Tower and Parking <br /> Garage project; <br /> ■ The logs of three borings(EB-1 through EB-3)completed by Associated Earth Sciences, Inc. in 2003 for <br /> the Colby Cancer Center project;and <br /> ■ The logs of one boring(RZ-2) completed by Rittenhouse-Zeman &Associates in 1988 for the Everett <br /> General Hospital project. <br /> GEOENGINEERS April 22,2016 1 Page A-1 <br /> F eNo.10738 010 <br />