Laserfiche WebLink
Date(s) 08/08/08 Logged ABA CC�ecked DPC , <br /> Drilled By <br /> Drilling Boretec Drilling Hollow-stem Auger Sampling SPT <br /> Contractor Method g Methods <br /> Auger 4%-inch I.D. Hammer 140 lb hammer/30 in drop Drilling Limited Access Track Rig <br /> Data Data Equipment Volvo EC55 <br /> Total 16 Surface Groundwater Not Encountered <br /> Depth(ft) Elevation(ft) Level(ft.bgs) <br /> Vertical Datum/ Easting(x): <br /> Datum System Northing(y): <br /> I <br /> SAMPLES <br /> w 0 o _ _ MATERIAL DESCRIPTION OTHER TESTS <br /> o z m m • _ AND NOTES <br /> ' (a > -4 m N J L sZ 5 = N c t <br /> 0 tU O 0 d E N t`0 o) 0 E 0 O Z.1 <br /> fU <br /> E tY m to rnn 5 0_1 0 to 2 0 0 <br /> 0 <br /> 12./.7,s1 SOD —3 inches grass,sod <br /> - SM _ Brown silty fine to medium sand with gravel(medium _ <br /> dense,moist)(fill) <br /> 18 15 1 <br /> I SM Grayish brown silty fine to medium sand with gravel <br /> (very dense,moist)(glacially consolidated soils) <br /> • <br /> 518 58 2 • <br /> — _ <br /> 7 I _ _ <br /> • <br /> - - (slow drilling) <br /> • <br /> • <br /> - - (till-like fabric) <br /> 10 17 77 3 1 <br /> il I • <br /> • <br /> • <br /> 151 12 75 T 4 <br /> Z <br /> m <br /> o - <br /> M <br /> a) <br /> O <br /> • <br /> 20— <br /> w <br /> a <br /> N - <br /> o <br /> N. <br /> 0 <br /> 0 <br /> CO <br /> 0 - <br /> 0 <br /> C1"/"; <br /> Z <br /> 25— <br /> s Note:See Figure A-I for explanation of symbols. <br /> 0 <br /> 0 <br /> m <br /> o, <br /> • <br /> o <br /> LOG OF BORING GEI-8 <br /> a <br /> zProject: Central Utility Plant <br /> G EO E N G I N E E R i Project Location: Everett, Washington Figure A-10 <br /> t, Project Number: 10738-007-02 Sheet 1 of 1 <br />