Laserfiche WebLink
Dates) Logged Checked <br /> Drilled 08/28/07 By CMK By MWS <br /> Drilling Boretec Drilling Hollow stem Auger Sampling SPT <br /> Contractor Method g Methods <br /> AugerHammer 140 lb hammer/30 in drop Drilling <br /> Data 4 ID Data Rope and Cathead Equipment EC-55 Track Mounted <br /> Total 16.5 Surface 118 Groundwater Not Encountered <br /> Depth(ft) Elevation(ft) Elevation(ft) <br /> Vertical Datum/ Easting(x): <br /> Datum System Northing(y): <br /> • SAMPLES <br /> w ws 'cr.,s <br /> > <br /> OTHER TESTS <br /> w 2 o Q = MATERIAL DESCRIPTION o <br /> N Oo 0zs_ 2.. AND NOTES <br /> N 6 y 0 _O 3 C Ca) D L <br /> N O U? DN O_ 3 Q 'N O) <br /> 1.11 a N 8o Q E co 6 co O E p <br /> o a N <br /> - 0 6 ft m in in O3 C0o �O a — <br /> GP Gravel parking lot(approximately 2 inches thick) <br /> _ - SM _ Brown/gray silty fine to medium sand with gravel _ <br /> (medium dense,moist)(fill) <br /> 1 t <br /> —115 16 13 15 SA,%F=35 — <br /> • <br /> SM _ Brown silty fine to medium sand with gravel and- — <br /> 5 - 4 50/4" 2 occasional cobbles(very dense,moist)(glacially Sampling on cobbles <br /> 7consolidated soils) <br /> Hard drilling <br /> 10 50/6" 3 • <br /> —110 � _ _ — <br /> •- 10 18 57 a _With silt layers <br /> 7 CL Gray clay with interbedded sand layers(hard,moist) ___ - <br /> —105 - <br /> - - — <br /> - 15 18 59 5a � — — - <br /> 1 <br /> _ 1 <br /> o—100 - — <br /> OD <br /> in <br /> r_ _ - <br /> 0 <br /> 0 <br /> 1- 20— <br /> > <br /> w <br /> 0 <br /> a <br /> 00 <br /> 0 <br /> 0 <br /> 0 <br /> 0—95 — <br /> r <br /> 0 <br /> Q^ <br /> z <br /> `=- 25— - <br /> s Note:See Figure A-I for explanation of symbols. <br /> o I <br /> 0 <br /> o <br /> 0 <br /> 7.e <br /> o <br /> LOG OF BORING GEI-3 <br /> 0_ <br /> zProject: Central Utility Plant <br /> F G EO E N G N E ERS Project Location: Everett, Washington Figure A-4 <br /> Project Number: 10738-007-01 Sheet 1 of 1 , <br />