Laserfiche WebLink
Table of Contents <br /> INTRODUCTION 1 <br /> PROJECT DESCRIPTION 1 <br /> PREVIOUS SITE EVALUATIONS 1 <br /> SITE CONDITIONS 2 <br /> Surface Conditions 2 <br /> Subsurface Conditions 2 <br /> Groundwater Conditions 2 <br /> CONCLUSIONS AND RECOMMENDATIONS 3 <br /> Earthquake Engineering 3 <br /> Liquefaction 3 <br /> Other Seismic Hazards 4 <br /> 2012 IBC Seismic Design Information 4 <br /> Excavation Support 4 <br /> Excavation Considerations 4 <br /> Temporary Cut Slopes 4 <br /> Foundations 5 <br /> Detention Vault Foundation 6 <br /> Settlement 6 <br /> Lateral Resistance 6 <br /> Light Pole Foundations 6 <br /> Construction Considerations 6 <br /> Below-Grade Utility Vault Wall Design 7 <br /> Buoyancy and Uplift 7 <br /> Below-Grade Walls 7 <br /> Drainage 8 <br /> Earthwork and Structural Fill 8 <br /> Excavation Considerations 8 <br /> Stripping,Clearing and Grubbing 9 <br /> Subgrade Preparation 9 <br /> Erosion and Sedimentation Control 9 <br /> Structural Fill 10 <br /> Permanent Slopes 12 <br /> Pavement Recommendations 12 <br /> Subgrade Preparation 12 <br /> New Hot Mix Asphalt Pavements 12 <br /> Asphalt-Treated Base Recommendations 12 <br /> Recommended Additional Geotechnical Services 13 <br /> LIMITATIONS 13 <br /> REFERENCES 13 <br /> GEOENGINEERS April 22.2016 Page <br /> File No.10?:13-010-0; <br />