My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC Geotech Report 2022-10-25
>
Address Records
>
13TH ST
>
1815
>
SEATTLE CHILDRENS NORTH CLINIC
>
Geotech Report
>
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:33:06 AM
Creation date
6/26/2019 9:49:40 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEATTLE CHILDRENS NORTH CLINIC
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If important changes are made after the date of this report,GeoEngineers should be given the opportunity <br /> to review our interpretations and recommendations and provide written modifications or confirmation, as <br /> appropriate. <br /> Subsurface Conditions Can Change <br /> This geotechnical or geologic report is based on conditions that existed at the time the study was performed. <br /> The findings and conclusions of this report may be affected by the passage of time, by manmade events <br /> such as construction on or adjacent to the site, or by natural events such as floods, earthquakes, slope <br /> instability or groundwater fluctuations.Always contact GeoEngineers before applying a report to determine <br /> if it remains applicable. <br /> Most Geotechnical and Geologic Findings Are Professional Opinions I <br /> Our interpretations of subsurface conditions are based on field observations from widely spaced sampling <br /> locations at the site.Site exploration identifies subsurface conditions only at those points where subsurface <br /> tests are conducted or samples are taken. GeoEngineers reviewed field and laboratory data and then <br /> applied our professional judgment to render an opinion about subsurface conditions throughout the site. <br /> Actual subsurface conditions may differ, sometimes significantly, from those indicated in this report. Our <br /> report,conclusions and interpretations should not be construed as a warranty of the subsurface conditions. <br /> Geotechnical Engineering Report Recommendations Are Not Final <br /> Do not over-rely on the preliminary construction recommendations included in this report. These <br /> recommendations are not final, because they were developed principally from GeoEngineers' professional <br /> judgment and opinion. GeoEngineers' recommendations can be finalized only by observing actual <br /> subsurface conditions revealed during construction.GeoEngineers cannot assume responsibility or liability <br /> for this report's recommendations if we do not perform construction observation. <br /> Sufficient monitoring,testing and consultation by GeoEngineers should be provided during construction to <br /> confirm that the conditions encountered are consistent with those indicated by the explorations,to provide <br /> recommendations for design changes should the conditions revealed during the work differ from those <br /> anticipated, and to evaluate whether or not earthwork activities are completed in accordance with our <br /> recommendations. Retaining GeoEngineers for construction observation for this project is the most <br /> effective method of managing the risks associated with unanticipated conditions. <br /> A Geotechnical Engineering or Geologic Report Could Be Subject to Misinterpretation <br /> Misinterpretation of this report by other design team members can result in costly problems. You could <br /> lower that risk by having GeoEngineers confer with appropriate members of the design team after <br /> submitting the report. Also retain GeoEngineers to review pertinent elements of the design team's plans <br /> and specifications.Contractors can also misinterpret a geotechnical engineering or geologic report. Reduce <br /> that risk by having GeoEngineers participate in pre-bid and preconstruction conferences, and by providing <br /> construction observation. <br /> GEoENGINEERS April 22.2016: Page B-2 <br /> Fife No.10738-010-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.