My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> 8.1. GENERAL <br /> ' Unless otherwise specifically stated in the Contract Documents,the Contractor shall provide and pay for <br /> materials,labor,tools,Equipment,water, light,power,transportation, supervision,and temporary <br /> construction of any nature,and other services and facilities of any nature,whatsoever necessary,to <br /> ' execute,complete and deliver the Work within the specified time. Contractor shall be liable for all power <br /> and water costs until Substantial Completion,whether such power or water is provided by temporary or <br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new <br /> ' and of the specified quality. Equipment offered shall be new or current specified models. This <br /> requirement does not apply to minor details, or to thoroughly demonstrated improvements in design or in <br /> materials of construction. Construction Work shall be executed in conformity with the standard practice <br /> ' of the trade. <br /> 8.2. PRODUCT DATA <br /> When specified,the Contractor shall provide data required for inspecting,testing,operating,or <br /> maintaining parts of the Work. Unless otherwise specified,such data shall be provided at the time the <br /> referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall <br /> include,unless otherwise specified, such items as shop drawings,erection drawings,reinforcing steel <br /> ' schedules,testing and adjusting instructions,operations manuals,maintenance procedures,parts lists, and <br /> record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability <br /> determined by the Owner in its sole discretion. <br /> 8.3. QUALITY <br /> Where detailed Specifications of materials, Equipment,or construction Work are not set forth,the <br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the <br /> ' materials and workmanship specified for the other parts of the Work,from firms of established good <br /> reputations,and shall follow standard practices to perform construction Work of good quality in a <br /> workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the <br /> t standard of construction and Equipment of Work as a whole and in part. All Work must comply and <br /> conform to applicable building codes in effect when the Work is performed. <br /> 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> ' When material or Equipment is specified by reference to patents,brand names,or catalog numbers,the <br /> Owner will not usually consider or approve a substitution. However,the Contractor may offer <br /> substitutions of products it considers to be equal to that specified,but the Owner is not obliged or required <br /> ' to consider or accept such offered substitution. <br /> 8.5. REQUESTS FOR SUBSTITUTION <br /> The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's offers of <br /> substitution shall be made in writing to the Owner's Representative and shall include sufficient data to <br /> ' enable the Owner's Representative to assess the acceptability of the material or Equipment for the <br /> particular application and requirements. The Owner and Owner's Representative are not required or <br /> obligated to consider or review a request for substitution and may, in their sole discretion and option, <br /> consider or review such requests. <br /> If the offered substitution requires changes to or coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br /> General Conditions—007200-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.