Laserfiche WebLink
I <br /> ATTACHMENT 5 <br /> ADDENDUM NO. 1 <br /> SUBSTITUTION REQUEST REVIEW <br /> SUBSTITUTION REQUEST REVIEW <br /> Approval applies to manufacturer only and does not relieve the Contractor/Supplier from the responsibility <br /> of meeting all applicable requirements of the Plans and Specifications. <br /> The following representatives and manufacturers have further agreed upon the following: <br /> I. The proposed substitution does not affect dimensions shown on the Drawings. <br /> 2. The proposer will pay for changes to the building design,including engineering design,detailing,and <br /> construction costs caused by the requested substitution. <br /> 3. The proposed substitution will have no adverse effect on other trades, the construction schedule, or <br /> specified warranty requirements. <br /> 1 4. Maintenance and service parts will be locally available for the proposed substitution. <br /> 5. The proposed substitution function,appearance. and quality are equivalent or superior to the specified <br /> item. <br /> SPED PROPOSED SUBSTITUTION REPRESENTATIVE APPROVED? <br /> SECTION <br /> 32.18.23 DFE x Jeff Bergevin Rejected <br /> END OF SUBSTITUTION REQUEST REVIEW <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> Addendum No. 1 —Substitution Request Review <br /> Page 1 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />