Laserfiche WebLink
1 <br /> ATTACHMENT 6 <br /> ADDENDUM NO. 1 <br /> RESPONSE TO PRE-BID QUESTIONS <br /> removed at control or expansion joints and full sections replaced;asphalt may be saw cut, <br /> patched as needed for all new work. <br /> 9. Q Irrigation heads and valves? <br /> a. Parks staff will remove what they want to salvage, all over headsivalveslequipment shall <br /> be removed and disposed of offsite.Mainline shall be capped,all laterals within the fields <br /> can stay and be removed as found if needed during the renovation of the fields. <br /> 10. Q: What about existing bleachers? <br /> a. (Erik, I changed ray mind) Contractor shall be responsible to relocate bleachers, if <br /> necessary for construction,and reinstall at same location. <br /> 11. Q: Substitution requests who do they go to? <br /> a. All substitution requests shall be sent to City for review. See the forms within the 1 <br /> documents. <br /> I <br /> END OF RESPONSE TO PRE-BID QUESTIONS. I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> Addendum No. 1—Response to Pre-Bid ' <br /> Page`2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />