My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 002513 <br /> Pre-Bid Meeting-Mandatory <br /> PART 1 GENERAL: <br /> ' 1.01 SUMMARY <br /> A. Section includes location and agenda of the pre-bid meeting. <br /> B. This project requires bidders performing work to attend a Mandatory Pre-Bid Walk <br /> Thru. All bidders interested in submitting bids for the work shall attend at least one <br /> of the scheduled walk-thru. Signature from all contractors submitting bids must be <br /> on the bid submittal sheet. <br /> C. Bids received from Contractors not attending at least(1)one walk-thru will be found <br /> non-responsive and bid will be rejected. <br /> 1.02 Date <br /> ' A. Meeting 1 - Thursday,March 14, 2019 <br /> B. Meeting 2 - Thursday,March 21, 2019 <br /> 1.03 Location <br /> A. The meeting place will be at the Phil Johnson Ballfields Complex which is located at <br /> ' 400 W Sievers-Duecy Blvd. Everett, WA <br /> B. The meeting location will be at the complex building. <br /> ' 1.04 Time <br /> A. March 14, 2019 -Meeting will start promptly at 11:00 AM <br /> B. March 21, 2019 -Meeting will start promptly at 11:00 AM <br /> 1.05 Agenda <br /> A. Review Scope of Project <br /> B. Review required documents to be submitted with the Bid Form <br /> C. Bid Due Date <br /> D. Review Scope of Work including criteria for each discipline <br /> E. Review Addendums to date <br /> F. Review bid documents, instructions to bidders etc. <br /> ' G. Receive questions, comments from bidders <br /> H. Site visit to Location of Irrigation Controller(Irrigation Controller will only be <br /> available for viewing during the pre-bid walk thru.) <br /> I. Site visit to Pump Room (Pump room will only be available for viewing during the <br /> pre-bid walk-thru) <br /> J. Contractors free to wander construction site <br /> 1 <br /> Phil Johnson Ballfields Renovation Page 1 of 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.