Laserfiche WebLink
Section 002513 <br /> Pre-Bid Meeting-Mandatory <br /> PART 1 GENERAL: <br /> ' 1.01 SUMMARY <br /> A. Section includes location and agenda of the pre-bid meeting. <br /> B. This project requires bidders performing work to attend a Mandatory Pre-Bid Walk <br /> Thru. All bidders interested in submitting bids for the work shall attend at least one <br /> of the scheduled walk-thru. Signature from all contractors submitting bids must be <br /> on the bid submittal sheet. <br /> C. Bids received from Contractors not attending at least(1)one walk-thru will be found <br /> non-responsive and bid will be rejected. <br /> 1.02 Date <br /> ' A. Meeting 1 - Thursday,March 14, 2019 <br /> B. Meeting 2 - Thursday,March 21, 2019 <br /> 1.03 Location <br /> A. The meeting place will be at the Phil Johnson Ballfields Complex which is located at <br /> ' 400 W Sievers-Duecy Blvd. Everett, WA <br /> B. The meeting location will be at the complex building. <br /> ' 1.04 Time <br /> A. March 14, 2019 -Meeting will start promptly at 11:00 AM <br /> B. March 21, 2019 -Meeting will start promptly at 11:00 AM <br /> 1.05 Agenda <br /> A. Review Scope of Project <br /> B. Review required documents to be submitted with the Bid Form <br /> C. Bid Due Date <br /> D. Review Scope of Work including criteria for each discipline <br /> E. Review Addendums to date <br /> F. Review bid documents, instructions to bidders etc. <br /> ' G. Receive questions, comments from bidders <br /> H. Site visit to Location of Irrigation Controller(Irrigation Controller will only be <br /> available for viewing during the pre-bid walk thru.) <br /> I. Site visit to Pump Room (Pump room will only be available for viewing during the <br /> pre-bid walk-thru) <br /> J. Contractors free to wander construction site <br /> 1 <br /> Phil Johnson Ballfields Renovation Page 1 of 2 <br /> I <br />