My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 52 13 <br /> Agreement Form <br /> CONTRACT <br /> ' THIS CONTRACT is made and entered into this 15th day of May , 2019 , by and between the City of <br /> Everett, Washington, a municipal corporation existing under the laws of the State of Washington, <br /> hereinafter called the "City," and Premier Field Development, Inc., a Washington Corporation, <br /> hereinafter called the"Contractor." <br /> In consideration of the sums to be paid to it by the City,Contractor hereby covenants and agrees to furnish <br /> ' all labor, tools, materials, equipment, and supplies required to build and construct and to build and <br /> construct in a workmanlike manner the Work, improvements, and appurtenances in accordance with the <br /> Specifications and Drawings entitled: "Phil Johnson Ballfields Renovation", (the "Project"). <br /> 1. Contract Documents.The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> A. Notice to Bidders <br /> B. Instructions to Bidders <br /> C. General Conditions <br /> D. Supplementary Conditions(if any) <br /> E. Drawings, Standard Plans, and Specifications <br /> F. Addenda (if any) <br /> G. Payment and Performance Bonds <br /> H. Contractor's Bid Form <br /> I. Other documents described as Contract Documents in Section 072000,General <br /> ' Conditions <br /> J. All provisions required by law whether set forth and reproduced herein or not <br /> Terms that are capitalized in a Contract Document but not defined in that Contract Document shall have <br /> the meaning defined to them in the other Contract Documents. <br /> ' 2. Contract Time. Substantial Completion of the Work shall be achieved within One Hundred Sixty <br /> (160)WORKING Days after the effective date of the Notice to Proceed. Physical Completion shall be <br /> within Fifteen (15) WORKING Days after the actual date of issuance of substantial completion. <br /> Phil Johnson Ballfields Renovation 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.