Laserfiche WebLink
I <br /> Section 00 63 25 <br /> Substitution Request Form <br /> PROJECT: Phil Johnson Ballfields Renovation <br /> REQUEST NO.: <br /> CONTRACTOR: DATE: <br /> We hereby submit for consideration,following product instead of specified item for above <br /> I project: <br /> Section Specified Item <br /> Proposed Substitution <br /> Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> Attach detailed comparison of the significant qualities (size,weight, durability, performance and <br /> similar characteristics, and including visual effect where applicable)for the proposed <br /> substitution in comparison with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required by <br /> proposal. <br /> Fill in Blanks Below: <br /> A. Does substitution require change in Drawing dimensions? <br /> B. Will Undersigned pay for resulting building design changes including engineering and <br /> detailing costs? <br /> C. What effect does substitution have on other trades? <br /> D. Differences between proposed substitution and specified item? <br /> E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> F. Name and address of three (3)similar projects on which product was used, and date of <br /> installation <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> H. Cost Savings? <br /> Phil Johnson Ballfields Renovation 1 of 2 <br /> I <br />