My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I Section 007200 <br /> General Conditions <br /> 1 8.2. Product Data 25 <br /> 8.3. Quality 25 <br /> I 8.4. Material and Equipment Specified by Name 25 <br /> 8.5. Requests for Substitution 25 <br /> 8.6. Demonstration of Compliance with Contract Requirements 26 <br /> I 8.6.1. Inspection 26 <br /> 8.6.2. Samples of Materials 26 <br /> 8.6.3. Certification 26 <br /> I 8.6.4. Inspection at Point of Manufacturing 26 <br /> 8.6.5. Testing and Commissioning of Completed Work 27 <br /> 8.6.6. Storage of Materials and Equipment 27 <br /> I 8.6.7. Manufacturer's Directions 27 <br /> 8.7. Defective Work 27 <br /> 8.7.1. Correction of Defective Work 27 <br /> I 8.7.2. Retention of Defective Work 27 <br /> 8.8. Materials and Equipment Furnished by Owner 28 <br /> 8.9. Guarantee 28 <br /> I 8.10. Correction Period 28 <br /> 9. MEASUREMENT AND PAYMENT 29 <br /> 9.1. Payments to Contractor 29 <br /> I9.1.1. Schedule of Values 29 <br /> 9.1.2. Progress Payments 29 <br /> 9.1.2.1 Payment Request Procedures: 29 <br /> I9.1.2.2 Review Procedures: 30 <br /> 9.1.2.3 Retained Percentage 30 <br /> I 9.1.2.4 Withholding 30 <br /> 9.1.3. Final Payment 31 <br /> 9.2. Payment for Changes 32 <br /> I <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 32 <br /> 9.2.1.1. Increased Quantities 32 <br /> 9.2.1.2. Decreased Quantities 32 <br /> I 9.2.1.3. Limitations 32 <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 32 <br /> 9.2.3. Deleted Work 32 <br /> I 9.3. Charges to Contractor 33 <br /> 9.4. Compensation to Owner for Time Extension 34 <br /> 9.5. Adjustment of Contract Sum 34 <br /> I 9.5.1 Calculation 34 <br /> 9.5.2 Limitations 34 <br /> 9.5.3 Unabsorbed and Extended Overhead 35 <br /> I 9.6. Force Account 35 <br /> 9.6.1 Labor 36 <br /> 9.6.2. Materials. 36 <br /> 1 9.6.3. Equipment 37 <br /> - General Conditions—007200-in <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.