My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> over the administration of the Contract. Whenever it is so provided in this Contract,the decision of the <br /> IOwner's Representative shall be final. <br /> The Owner's Representative's decisions will be final on all questions including but not limited to,unless <br /> I specifically assigned to an Architect or Engineer,the following: <br /> 1. Measurement of Work,whether lump sum, Force Account, or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> 1 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; <br /> I 5. Fulfillment of the Contract by the Contractor; <br /> 6. Payments under the Contract including adjustment and; <br /> 7. Suspension(s)of Work. <br /> I <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders from the Owner's <br /> Representative: <br /> I 1. The Owner's Representative may use the Owner's resources,other contractors,or other means to <br /> accomplish the Work,and <br /> 2. The Owner will not be obligated to pay the Contractor,and will deduct from the Contractor's <br /> I payments,any costs that result when any other means are used to carry out the Contract <br /> requirements or Owner's Representative's orders. <br /> At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> I 1. The Contractor fails to fulfill Contract terms,to carry out the Owner's Representative's orders, or <br /> to correct unsafe conditions of any nature; or <br /> 2. It is in the public interest. <br /> I The Owner's Representative and Owner shall have complete access to the Work and to the Site of the <br /> Work and to the places where Work is being prepared or where materials,Equipment, and machinery are <br /> being obtained for the Work. If requested by the Owner's Representative or Owner,the Contractor shall <br /> I provide the assistance necessary for obtaining such access, and shall provide information related to the <br /> inspection of construction. Absence of such access or information, as needed, may result in the Owner's <br /> refusal to accept the Work. <br /> I The Owner's Representative has the authority to recommend Change Orders, but does not have authority <br /> to approve Change Orders. Proposed Change Orders are subject to review and approval by the Owner. <br /> No proposed Change Order or any change of Contract Sum or Contract Time is effective or binding upon <br /> I the Owner unless and until the Mayor or his or her designee signs it, as authorized by City Council or by <br /> ordinance. <br /> To detail and illustrate the Work,the Owner's Representative may furnish to the Contractor additional <br /> I Drawings and explanations consistent with the original Drawings. The Contractor shall perform the Work <br /> according to these additional Drawings and explanations. <br /> The Owner's Representative may appoint assistants and inspectors to assist in determining that the Work <br /> I and materials meet the Contract requirements. Assistants and inspectors have the authority to reject <br /> defective material and suspend Work that is being done improperly, subject to the final decisions of the <br /> Owner's Representative or,when appropriate,the Owner. <br /> I Assistants and inspectors are not authorized to accept work,to accept materials,to issue instructions,or to <br /> give advice that is contrary to the Contract. Work done or material furnished which does not meet the <br /> Contract requirements shall be at the Contractor's risk and shall not be a basis for a Contract Claim even <br /> if the Owner's Representative, inspectors or assistants purport to change the Contract. <br /> - General Conditions—007200-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.