Laserfiche WebLink
� �ENERAL NOTES <br /> A. ALL SPRINKLER PlPE SH,ALL BE SCHEDULE 40 REGARDLESS OF SlZE. <br /> S. ALL SPRINKLER PIPE SMALL BE THREADED OR ROLL GROOVED. <br /> C. ALL SYSTEMS SHALL BE HYDROSTATIGALLY TESTED AT 200 PSI OR 5D PSI <br /> IN EXCESS QF SYSTEM WORKING PRESSURE,WHIGHEVER IS GREATER. <br /> Q. EARTHQUAKE BRAGING SHALL�E PROVIDEd IN ACCORDANCE WITH THE <br /> BOEING FIRE DEPART(NENT, FM GLOBAL AND NFPA 13 AS REGIUIRECl. i <br /> E. ALL COMRONENTS 3HALL BE UL LISTED 1 FM APPROVEO. � <br /> SEE�HEET FP-SP 16 FdR COMTINUATION SEE SHEET FP-SP 16 FOR CONTINUATION F. ALL THREADED FITTINGS SHALL BE CLASS 125 GAST IRON PER BOEING � <br /> SPEGIFICATIQNS. � <br /> G. ALL ELECTRICAL WVIRING TO BE PERFQMEp BY QTHER3. Q,� <br /> g " � � � -3 ' � - - H. START POlNT OF ALL WORK IS AT FLANGE ABOVE FINISH FLOQR.ALL <br /> � � <br /> � 3. � 3. � ����� �, � �. O 3. .� ��� � 4���� �� ����� ,1, UNDERGROND WQRK IS TO 6E PERFORMED BY OTHERS AND SHALL BE � �1 � �' <br /> � � `� � � �� CC�MPLETED PER NFPA?�i. � �� � � �, � <br /> $ :fl <br /> 23'-0 23'-0 25'-0 30'-D � 3D-Q � �' 31'-0 8'-3 � i .- oo � cn <br /> x � �� �u �� -��, ��� ������ n . r� �� �. � I. STANDRIPE HAS BEEN DESlGNED TO PR4VIDE 100P51 PER HQSE YALVE � � �= �'� ' � <br /> �� :�� �W ���� -�� � ���' � a� �� ���;�� �� "n � � �� "' G:, <br />