<br /> STATEMENT �F S�ECIA� INSP��TI�JNS 2fl12 I�G SPE�IAL IN�PEGTIC�(� REQUIREC� BY 2C�12 IBC �'
<br /> �-
<br /> 1. IN ACCORDANCE TO SECTION 1704.2 QF THE 2q121NTERNATIqtVAL BUILdING C(�DE �
<br /> ' (IBC), THE OWNER IS REQUIRED TU NIf�E AN I�fDEPENDENfi INDI�ATEC3 ITEMS REQUIRING SP�GIAL INSPECTIUN ARE IDENTI�IEL7 UNDER Ct?LUMNS "FREQUENCY QF INSPECTIQN"AS '"PEFtIODIC" C7R
<br /> TESTING/INSPECTION AGENCY TQ PERFaRM REQUIRED SFECIAL INSRECTIQNS. GO�JTINU�}US . IF NC} BQX IS CHECKED, EITHER THE TASK L3�ES NC7T EXIST 4R DOES NOT NEED ANY SPECIAL INSPEC710N. �
<br /> 2 THE REQU REMENTS QF Q12�IBC SECTIC}NS 17� q Q�D��LOW IS FULFILLME�lT�}F �TR��TV R�� ���EL IBL.,r � ���.�.� � � 7U�. � � . 1 � � 7��. 1 �.2 N�NDESTRU�TIVE TESTING TABLE �5.�'� �I�Lr ���-� � .
<br /> t � � � �
<br /> �
<br /> 3 APPROVEDSPLANS AND SPEC F CATIONS, THIS STAT�EMENT,I I�C 042 CHAPTER�17 Ah1D P F�I{�R TC3 UiIE L D I�1 G (TA�L E N�.�'� � �iI S t,� ���'� V�. �TEM FREQUENCY Qf INSPECTION INSTRUCTI4NS �
<br /> AISC 360-10 SECTION "N5". �
<br /> ITEM �f�EQUENCY OF I�ISPECTION INSTRUCTIO�IS CJP WELDS (RISK CAT il} CONTINUQUS ❑ PE�IODIC � ULTRASQNIC TESTING SHA�L BE PERFORMED C�
<br /> 4. THE INSPECTOR SHALL OBSERVE THE WORK FQR COMPLIAhICE WITH THE JURISDICTION UN 10°/a 0�CJP GROOVE WELDS IN BUTT, T-AND �-�—
<br /> APPROVED PLANS, SPECIFICATIONS, A�VD APPL.ICABLE PROVISIONS OF THE IBC, TH� CORNER JQIN7S SUBJECT TO TRANSVERSELY W
<br /> ARCHITECTS/ENGINEER'S REVIEV1fED SHOP DRAWINGS,A1VD/OR PLACEMENT DRAWINGS, VERIFY WELLING PROCEDURES {WPS) CQNTINUCJUS � PERIOCIIC ❑ APPLIED TENSION LOADING IN MATERIALS 5/16-INCH
<br /> MAY BE USED �NLY AS AN AID TO INSPECTIC?NS. AND CONSUMABLE CERTIFICA7ES THICK OR GREATER TESTING RATE MUST BE
<br /> INCREASED OF> 5% OF WELDS TESTED HAVE
<br /> a. CONTINU�US SPECIAL INSPECTIfJN-THE FULL-TIME 4BSERUATICIN OF UVORK UNAC�EPTABLE DEFECTS. �
<br /> REQUIRING SPEGiAL INSPECTIC3N BY AN APPR�VED SPEGIAL INSPECTOR WHO I� MATERIAL IDENTI�ICATIt��J �QIUTINU4US ❑ PERI�DIC � VERIFY TYPE AND GRADE C}F MATERIAL.
<br /> PRESENT IN THE AREA WHERE�HE 1(V�RK IS BEING PE�tF�JRMED.
<br /> b. PERIODIC SPECIAL INSPEGTION -THE PART-TIME C?R INTERMITTENT WELDER I�ENTIFICATI{��V CC}NTINUaUS ❑ PERIC}DIC �
<br /> A SYSTEM SHALL BE MAINTAINE�I BY WHICH A �����5 M�3LE� tFLA�IG�>2") GONTINUQUS ❑ PERI4DIC � TESTED PER AISC 360-10-5C.
<br /> OBSERVATION QF W4RK REQUIRING SPECIAL INSF'ECTION BY AN APPR4VED WELD�R 1NHCJ HAS WUELDED A J41NT{�R
<br /> SPECIAL INSPECT(?R WHQ IS PRES�NT IN TH�AREA WHERE THE WORK IS BEING MEMBER CAN BE IDENTIFIED,
<br /> PERF�RMED AND AT TNE Ct7MPLETION OF THE WORK. WELDED JQINTS SUBJECT TC3 FATIGUE C(3NTINUOUS � PERI�DIC ❑ PER AISC 360-10-5D.
<br /> 5. THE SPECIAL INSPECTOR SHALL GOMPLETE A DAILY REPORT FOR EACH DAYS FIT-UP GRtJ4VE WELDB G4NTINUC}US ❑ PERIC}l�IC � VERIFY JUINT PREPARATION, CfIMENSIQNS,
<br /> INSPECTIONS.THE DAILY REPOR7S SHALL REMAIN AT THE J(�B SITE Vd+ITH THE C�EANLINE;S, TACKING, AND BACKING
<br /> CONTRACTOR FORTHE BUILDING DIVISI�N'S INSPECTOR. THE REPURTS �HALL PRIC�R TfJ B�LTI �J� �TP�BLE N5.4'�� t`iI�?l� ���'� ��.
<br /> INCLUDE THE FOLLOWING. ACGESS NOLES GQNTINUOUS ❑ PERIC?DIC � VERIFY C4NFIGURATIQN AND FINISH.
<br /> a. NAME 4F SPECIAL II�SPECTflR AND DATE THE INSPECTIC3N WAS PERFORMED. 17EM FREQUENCY OF INSPECTIflN I�lSTRUCTION�
<br /> b. DESCRIPTION OF THE INSPECTIONS, VIIITH L�CATIQNS AND TESTS PERFORMED. FIT-UP OF FILLET WELD� C�JNTINUQUS ❑ PERIQDIC � VERIFY ALIGNMENT, (�APS AT R04T,
<br /> CLEANLINESS 4F STEEL SURFACES,AND TACK CERTIFICATIQNS OF FASTE�IERS CONTINUOUS � PERlQDIC ❑
<br /> c, LISTING ANY NO�J-GQNFCJRMING IT�MS. WELD�UALITY AND LUCATION.
<br /> d. INCLUDE H4W ITEMS WERE R�SOLVED OR UNRES�LVED. � FASTENERS MARKED CC3NTINUQUS ❑ PERI�DIC � VERIFY THAT FASTENERS HAVE BEEN MARKED IN
<br /> e. LIST ANY CHANGES {�R GORRECTIONS TO NON-�ONFORMING ISSUES AUTHORIZED ��R��y ti.7 Y� C����y V {TAB L E �l�.���� �I�.7 t� ����� ��. ACGORDANCE WITH ASTM REQUIREMENTS.
<br /> BY THE ENGINEER, ARCHITECT, OR BUILDI�JG DIVISION'S INSPECTORS.
<br /> 6. THE INSPECTOR SHALL BRING NON-CONFQRMING ITEMS T{�TH� IMMEQIATE ATTEIVTION �F ITEM FREQUENCY OF INSPECTIQN INSTRUCTIQNS PROPER FASTENERS F�R JOINT CQNTINUOUS ❑ PERIODIC � VERIFY GRADE, TYPE, AND BOLT LENGTH IF
<br /> THE CONTRACTOR, AND NOTE ALL SUCH ITEMS IN THE DAILY REPORT. IF ANY ITEM IS NQT THREADS ARE EXCLUDED FROM THE SHEAR
<br /> RESOLVED IN A TIMELY MANNER AND IS AB�UT TO SE INCaRPORATED IN THE V110RK,THE USE 4f QUALIFIED WELC?ERS CO�JTINU�US ❑ PERIt�DIC �
<br /> VERIFY THAT WELDERS ARE APPI��PRIl�TELY PLANE.
<br /> SPECIAL INSPECT�RS SHALL IMMEDIATELY NaTIFY THE QWNER AND THE ENGINEER C�F RECC}RD. QUALIFIE�. �
<br /> P'RQPER 6fJLTINC� PROCEDURE CONTINUDUS ❑ PERIODIC � VERIFY PRQPER PROCEDURE IS USED FOR THE
<br /> 7. THE INSPEGTIQN AGENCY SNALL FURNISH M�NTHLY REP4RTS�F THE TEST AND CaNTROL AND HANDLING t7F W�LDING CONTINUOUS ❑ PERIC}DIC � VERIFY PACKAGING AND EXP�iURE CQNTR�L. JQINT DETAIL.
<br /> INSPECTIONS PERFORMED DIRECTLY TQ THE BUILDING DIVISIt?N, ENGINEER QF RECOR�, G4NSUMA�BLES
<br /> AND/OR O7HERS AS DESIGNATED. CONNECTING ELEMENTS CONTINU�US ❑ PERIQDIC � 'VERIFY APPROPRIATE FAYING SURFACE
<br /> 8. THE INSPECTION AGENCY SHALL SUBMIT R FINAL SIGNED AND SEALED REPflRT T�THE ���1��D TACK 1NELDS C4NTI�1Uf�US ❑ PERIODIC � VERIFY THAT WEI�DING DC7ES NdT flCCUR CONDITIC7N A�D H�LE PREPA{�ATION, IE
<br /> BUILDING DIVISION STATING THAT ALL ITEMS REQUIRING SPECIAL INSPEGTIO�IS A(VD TESTING C�UER CRACKED T�CK WELDS, SPECIFIED, MEET REQUIREMENTS.
<br /> WERE FULFILLED,ALL DISCREPANCIES UVERE C�RRECTED OF�RESfJLVED,Af�D pl.L WORK
<br /> REQUIRING SPECIAL WSRECTI�INS IS IN CONFC}RMP�NCE WITH THE APPRQVED DESIGN PRE-INSTALLATION VERI�'ICATION CQNTINU4US ❑ PERIODI� � tJ�SERVE AND �OCUMENT VERIFICATION
<br /> DRAWINGS AND SPECIFICATIQNS AND APPLICABLE CODES.ANY ITEMS UNRESQLVEa QR ENVIRqNMEfUTAL CdNDITIONS G4NTINUQUS ❑ PERI�DIC � VERIFY WIND SPEED IS WITHIN LIMITS AS WELL -���-���� TESTING BY INSTALLATION PERSONNEL FOR
<br /> DISCREPANGIES W COVERAGE �LE. MISSED INSPECTIQNS, PERIaDIC I�ISP�CTIONS WNEf� AS PRECIPITATION AND T�MPERA7URE. FASTENER ASSEMBLIES AND METHODS tJSED.
<br /> CONTINUOUS WAS REQUIRED, ETC) SHALL BE SPECIFICAL.LY ITEMIZEC? IN 7HE REPORT.
<br /> WPS FOLLOWED CQNTINU4US ❑ PERIODIC � VERIFY ITEMS SUGM AS SETTINGS UN WELDING
<br /> 9. THE STATEMENT OF SPECIAL INSPECTION HAS BEEN PREPARED BY THE ENGINEER Et�UIPMENT,TRAVEL SPEED, WELDING PROPER ST�RAGE �t�NTINUOUS ❑ PERIODIC � VERIFY PRUPER ST�RAGE 4F BQLTS, 8lJTS,
<br /> OF RECORD WITH THE UNDERSTANDING THAT THE BUIL�iNG QFFIGIALS WILL: MATERIALS, SHIELDING GAS T'�'PEIFLOW RAl"E, WASHERS,AND OTHER FAST�NER
<br /> REHEAT APPLIED, INTERPASS TEMPERATURE CflMPONENTS.
<br /> a. REVIEW AND APPRflUE THE QUALIFIGATI�NS QF THE SPECIAL INSPECT(JRS 1NN0 MAINTAINED AND PRQPER POSITI�N.
<br /> WILL PERFORM THE INSPECTI�NS. *� NOT REQUIRELI IF ONLY SNUG-TIGHT JOINTS ARE SPEGIFIED (PER SEGTION N5.6(1)OF AISC 360-10)
<br /> WELDING TECHNIQUES Ct7NTINUOUS ❑ PERIC}DIC � VEF�lFY INTERPASS AND FINAL CLEANI�IG, EACH
<br /> b. MONITOR SPECIAL INSPEGTI�JN ACTIVITIES �tN THE JUB SITE TO ASSURE THAT PASS IS WITHIN PROFI�E LIMITATIOIVS, AND � �I��' ��L�I�G TABLE �1 . 'L /`1I
<br /> THE SPECIAL INS�ECT4RS ARE QUALIfiIED AN� PER�ORMING THEIR DUTIES AS QUALITY C1F EACH PASS. � � � � � �� ���-� ���
<br /> CALLED FOR IN THE STATEMENT�F SPECIAL INSPECTI�N.
<br /> c. REVIEW SUBMITTED INSPECTI(3N REPaRTS. Af TE1� YY EL�IN� �TABLE �5.�'�s �Iti7� ��U'1 ��. ITEM FREQUE�JCYOF INSPECTION INSTRUCTIONS
<br /> d. PERF4RM INSPECTIONS AS REQUIRED BY THE LOCAL BUILDING CODE. FASTENER ASSEMBLIES C4�1TINl10US ❑ PEf�IC1DIC � �ERI�Y THAT�ASTENER ASSEMBLIES ARE OF
<br /> � ITEM fREQUENCY OF INSPECTIaN INSTRUCTIOIJS SUITABLE CONDITIUN, PLACED IN ALL HOLES,
<br /> e. WILL ISSUE CERTIFICATION t�F OCCUPANCY AFTER ALL SPECIAL INSPEGTIUN
<br /> REPORTS AND TH� FINAL SPECIAL INSPECTIQN REPORT HAVE BEEN SUBMITTED AND WASHERS ARE POSITIONED AS REQUIRED.
<br /> AND ACCEPTED. WELDS CLEANED CQNTINU4US ❑ PERIQDIG � VERIFY THAT WELDS HAVE BEEN PROPERLY
<br /> CLEANED
<br /> SIUUG-TIGNT PRIOR T� PRETENSIONING CONTINU4US ❑ PERI4DIC � VERIFY THAT JQINTS ARE BROUGHT TO SNUG-
<br /> � TIGHT C�NDITION PRIOR TQ PRETENSIONING
<br /> SIZE, LENGTH, ANC? LOGATIUN 4F CONTINUOUS � RERit}DIC OPERATI�N.
<br /> WELDS
<br /> FASTENER C�IMPONENT CUNTINUOUS ❑ PERI�DIC � VERI�Y THAT FASTENER COMPONENT IS NOT
<br /> WELDS MEET VISUAL ACCEPTAPJCE CQNTINUOUS � PERIC?qIC ❑ TURNEQ BY WRENCH PREVENTED FROM
<br /> GRI7ERIA ROTATIMG.
<br /> ARC STRIKES CONTINUOUS � PERIODIC ❑ PRETENSI(JNED FASTENEI�S CONTINUOUS ❑ PERIOQIC � VERIFY THAT FASTENERS ARE PRETEN510NED
<br /> I�J ACC�RDANCE WITH RCSC SPECIFIGATION,
<br /> PI�OGRESSING SYSTEMATICALLY FROM THE
<br /> K-AREA CaNTINUOI�S � PERIODIC ❑ MaST RIGID POINT TQWARD THE FREE EDGES. �
<br /> �`* NOT REt�UIREQ IF t�NLY SNUG-TIGHT JOINTS ARc SP�CIFIED (PER SEC71qN N5,6�1) UF AISC 360-10).
<br /> ** NQT REQUIRED FQF�PRETENSIONED J�INTS US1NG TURN-OF-THE-NUT METHOD WITH MATGH-MARKING, DIRE�T-
<br /> BACKING &WELD TABS REMOVED CONTINUQUS � PERICtDIC ❑ TEN51aN-INDICATQRS, C3R TWIST-OFF TYPE TENSION CONTRflL M�THOD�PER SECTION N5.6{2)OF AISC 360-14}.
<br /> REPAIR ACTIVITIES C�NTINUQUS � PERIODI� ❑
<br /> DQCUMENT ACCEPTANCE flR Gt�NTINU�US � PERIODIC ❑
<br /> REJECTION OF WELDED JOINTfMEMBER
<br /> , , _
<br /> R�`��" �'�<q
<br /> �����E W A S y f �',yv
<br /> [Q1' � ' �'�d�
<br /> v�ci a1�
<br /> 26: P1! 9 -07- �' �G 4T)
<br /> ����j s t 4 ���```��
<br /> �'�. GR A� �� �y4,
<br /> "��� ��` � ��� ���'�+�� ;�l.����' ��'�. �s'�°�a� E��� �
<br /> _ �
<br /> ��?"���1�'1� �Vc""'1��;1�'��C1� ��i��� Dauid P. Balawajder �
<br /> - WA PE 28184 0
<br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL �} DA7E o
<br /> SYM REVI510(� BY APPROVED DATE SYM REVISION BY APPRQVEO DATE r�As ACCEPTABIUTY MEM �� a9 �� STATEME�IT C3F SPECIAL INSPECTIONS / /
<br /> �� °F "'��� cHE.KED W2548317 t.l 10 �9 14 �
<br /> 0 ISSUE FOR CONSTRUCTION MEM AHM 10/fl9J14 ��. T� THIS DESIGN AND,fOR �..,
<br /> ' � SPECIFICATION IS A{'PROVEC} �+H� �� �� �'� SHEEf �
<br /> �,�/'' � ' �"��+���5 nr� �OEING 777k CWC BUILDING :=�
<br /> '_ ; ENGINEERSING APPR�VED BY DEPT. DATE �P� 1 t� Q9 14
<br /> rro.3�3� CHECKED �
<br /> � _ _.._..__.�_. �w. B�I LD I N� �4-{�58 �
<br /> �� o APPROVED �oB N0. COMP No. �
<br /> .�, P�.� 15477651 �
<br /> c�T�"OF AUTN9��� APPR4VED STRUCT�JRAL MASTER EVERETT, WA °wc Nfl. 4Q-058—S2c