Laserfiche WebLink
6/12/2019 Page 1 <br /> City of Everett <br /> 11:38:53AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1905-003 Site Address 4706 GLENWOOD AVE <br /> Applied 5/2/2019 Applicant PASCHAL HEIDI Lot <br /> Approved 5/2/2019 Owner CONNAIR CHRISTOPHER Block <br /> Issued 5/2/2019 Contractor SMART ENERGY TODAY INC Tract <br /> Parent Permit No. Description BINSTALL PV SOLAR SYSTEM ON ROOFTOP <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 5/17/2019 5/17/2019 BLDG 15-FINAL DWF NOT READY Need Electrical final before Building final <br /> inspection. <br /> Have approved set of plans on site for <br /> inspection. <br /> 5/22/2019 5/22/2019 BLDG 14-FINAL KMK CORRECTION eTRAKiT Inspection 5/20/2019 8:23 AM Christopher Connair <br /> Request <br /> Contact Name:Christopher Connair <br /> Site Address:4706 GLENWOOD AVE <br /> Phone:9373055812 <br /> e-Mail:ccconnair@gmail.com <br /> (5/21/2019 11:55 AM KMK) <br /> KMK changed Inspection Type from BLDG <br /> 13-ROOF NAILING to BLDG 14-FINAL <br /> (5/21/2019 11:56 AM KMK) <br /> Complete electrical finalKMK changed <br /> Inspection Date/Time from 05/21/2019 to <br /> 05/22/2019 <br /> (5/22/2019 11:35 AM KMK) <br /> Complete electrical final inspection <br /> 6/4/2019 6/4/2019 BLDG 15-FINAL KMK APPROVAL Jenny 360-637-4343 ext 2224 <br /> 6/4/2019 6/4/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CRW YSTE MS <br />