My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 MERRILL CREEK PKY T MOBILE ANTENNA 2019-07-08
>
Address Records
>
MERRILL CREEK PKY
>
2215
>
T MOBILE ANTENNA
>
2215 MERRILL CREEK PKY T MOBILE ANTENNA 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 10:51:58 AM
Creation date
7/8/2019 10:51:55 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2215
Tenant Name
T MOBILE ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ,► CCROVVN <br /> ASTLE 1505 Westlake Avenue North Suite 800 Phone: (206) 336-3204 <br /> Seattle,WA 98109 Fax: <br /> www.crowncastle.com <br /> August 29,2018 <br /> City of Everett Permitting Services <br /> 3200 Cedar St. <br /> Everett,WA 98201 <br /> RE: Eligible Facilities Request to modify equipment on a communications tower located at: <br /> 2215 Merrill Creek Pky,Everett,WA,98203 <br /> Crown Site Number:826263/Crown Site Name:Norpro <br /> Customer Site Number:SEo1686A/Application Number:427343 <br /> Crown Castle USA Inc.("Crown Castle")on behalf of T-Mobile West LLC("T-Mobile")is submitting the attached <br /> Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at 2215 <br /> Merrill Creek Pky,Everett,WA 98203 in CITY OF EVERETT,WA(the"Norpro Tower"). <br /> Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012,commonly known as the"Spectrum Act" <br /> (Pub.Law No.112-96,126 Stat 156),mandates that state and local governments"may not deny,and shall approve,any <br /> eligible facilities request for a modification of an existing wireless tower or base station that does not substantially <br /> change the physical dimensions of such tower or base station." Additionally,if"the reviewing State or local government <br /> determines that the application is incomplete"[they]"must provide written notice to the applicant within 3o days of <br /> receipt of the application,clearly and specifically delineating all missing documents or information." Under federal law, <br /> an Eligible Facilities Request is deemed granted with written notification in sixty(6o)days after an application is filed <br /> with a local jurisdiction,excluding tolling. <br /> T-Mobile proposes to modify the"Norpro Tower"as follows: <br /> Remove(5)antennas and(3)RRU's;and install(5)antennas,(5)RRU's,(i)COVP,(i)hybrid cable system, <br /> and(8)diplexers on existing tower.T-Mobile also proposes to replace(2)cabinets within existing compound. <br /> Itemized list of submittal documents: <br /> • (1)Cover Letter <br /> • (1)Building Permit Application <br /> • (2)Structural Analysis stamped by Washington State engineer <br /> • (3)Construction Drawings stamped by Washington State engineer—11"x17"print <br /> • (1)Check for$385.61 <br /> T-Mobile is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval <br /> of requests to modify existing personal wireless service facilities. If you should require more information regarding the <br /> Spectrum Act,please do not hesitate to contact me with your questions. <br /> The Foundation for a Wireless World. //� <br /> CrownCastle.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.