Laserfiche WebLink
` <br /> . <-. .... . mI .z : <br /> IIVAC 9 6 1901:L L y , <br /> w o of axAMt e\\ OrVa4F y - <br /> , <br /> O A <br /> . _1_v.�3v ..�,�..xgN. . WMry1R' ,A.y8 \M _. uvC3a � ; a,as P� 3MMs . V <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii,iii,or v)is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> 0 (a) Electrical plan review is not required for: <br /> ❑ (i)Low voltage systems; <br /> 4--0 (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project,provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> ❑ does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> 4 ❑ (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> • (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii)For installations in(a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> �❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed;and <br /> (D) Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical,dental,and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional,or health care <br /> occupancies defined in this chapter. <br /> 0 (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> i i a$th.''oK PeErsaiiai.Care F,aF tit ies Eth area[are 1?,ris€crt tIQn Cd,ie P a 04,0401_[y crY of ic! Fait{'fi e <br /> i ea tharPersa 3 tar aggi t• Pias Re7itieVX ditfiz Tc �Er[€:'s tL 3tx�R [os Pja#rR*a : <br /> Tei= 00uareti:, Sttt¢r Eai *4;0014 <br /> Hosni tes <br /> t pr51ititOti:Wi b k0,Pg=tsfiio Yes s r t itTt2ad. <br /> pare^tiit4€ :St.`sS�f��r�,sai ��' <br /> ::toarcliaghome 3ies <br /> ;4.11,2 eaietrhofism hos{il ai 'Yes hkpf s a fsles;&pt[1 atx'ii t1-2, <br /> 0:r3vste Wsk '3ietr.10: E YdS ." i[t4 rA'A to iter fr I it15P$ t <br /> t:aternity.home Yes • Yxlx 'r2 ii0:014 ' eYtgvd oft fa iiitytypes Shat <br /> Obq±atory o rget'f fact ty v;ks • <br /> re ra t�€ t}}tlxa i.s��itme if. <br /> Renal h'emadiaiysis.ante 1Sres <br /> Resider5ti&i.tre0nieltfa04 Yes <br /> .enhanced servIcefkiiity. Yes, <br /> a3Sis.EIS r.Psicieitt'iaP.r bi5i atioit yes PERMIT# Page 2-Plan Review <br /> (IOW <br />