Laserfiche WebLink
INSPECTION REPORT <br /> A `, bate,` ILA Permit: .l1 ' __ <br /> ..} . ~, _� <br /> Contractor: <br /> Owner: of.. l- r 6- <br /> Site Addre s: V.Y .6 WAIn v i4-eCVS /PgL, <br /> \arkTYPE OF INSPECTION REQUESTED <br /> }SE ICAL BUILDING MECHANICAL PLUMBING <br /> emp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ]Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL g•PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 0 t a 1-1-4 ....5 - oaf <br /> _,-- _ - e..,-()I c.e cyppo <br /> ( I— <br /> 6_____- ... <br /> l / G <br /> CicpInspector: Date: V/ZIA/V42 <br /> EIR(10/06) DATABAR,INC. <br />