Laserfiche WebLink
RESIDENT-_ PHOTOVOLTAIC PERMIT A&ICATION (Page 2 of 2) <br /> /1111Pd::‘ CITY OF EVERETT PERMIT SERVICES <br /> ' 3200 CEDAR STREET,EVERETT,WA 98201 <br /> (P)425-257-8810 I FAX 425-257-8857 ((E)everetteps@everettwa.gov I www.everettwa.gov/permits <br /> ELECTRICAL PERMIT CHECKLIST <br /> DETERMINE IF YOUR PROJECT QUALIFIES FOR AN OVER-THE-COUNTER ELECTRICAL PERMIT: <br /> If you answer yes to all of the below questions,the project qualifies for an over-the-counter electrical permit YES NO <br /> 1. PV modules,inverters,and combiner boxes are identified for use in PV systems. Q 0 <br /> 2.The inverters are listed and leveled in accordance with UL 1741 and are listed for utility interaction.[IRC M2302.4] ❑ <br /> 3.The AC interconnection point is on the load side of service disconnect.[NEC 690.64(B)] ® ❑ <br /> 4.The system meets all current NEC,City,and Washington Cities Electrical Code requirements. (Y7 0 <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service disconnects. El 0 <br /> 6.Maximum load added to the panel board is vased on the rating of the panelboards bus/main OCPD combination in accordance <br /> with NEC 705.12(DX2X3Xb),and is limited to(comer(the combination below that applies): <br /> 0 225amp bus/200amp main OCPD-13,400AC watts,max.70amp inverter OCPD. <br /> Q 225amp bus/225amp main OCPD-8,640AC watts,max.45amp inverter OCPD. <br /> 121(200amp bus/200amp main OCPD-7,860AC watts,max.40amp inverter OCPD. <br /> ❑ 150amp bus/150amp main OCPD-5,760AC watts,max.30amp inverter OCPD. <br /> ❑125amp bus/125amp main OCPD-4,800AC watts,max.25amp inverter OCPD. <br /> ❑ 125amp bus/100amp main OCPD-9,600AC watts,max.50amp inverter OCPD. <br /> Q 100amp txts/100amp main OCPD-3,844AC watts,max.20amp inverter OCPD. <br /> ❑Other Electrical Permit with Plan Review Required: <br /> Note rt:ustea un-aicerea tarry marnrous commotion.Anerauon of me parernoara main ut t u war require pian <br /> review <br /> Note 2:The circa conductors and overcurrent devices shall be sized to carry not less than 125 percent of the <br /> maximum currents as calculated in 690.8(A).The rating or setting of overcurrent devices shall be permitted in <br /> accordance with 240.4(8)and(C).[NEC 690.8(BX1)1 <br /> Note 3:If a panelboard employs a snap switch rated 30 amperes or less in any branch circuit,it cannot be rated more <br /> than 200 amperes unless there is a supply side overcurrent protection at 200 amperes or less within the panelboard. <br /> This requirement does not apply to panelboards equipped with circuit breakers.Section 408.36(a)of the NEC. <br /> 7. 1 have attached the following Electrical One-Lane Diagram: <br /> 0 Standard Electrical Diagram-6 Strings or Less <br /> El Standard Electrical Diagram-4 Strings or Less <br /> Q Standard Electrical Diagram-Micro inverter <br /> ❑None of the above-Electrical Permit with Plan Review Required <br /> PLEASE FILL OUT A CITY OF EVERETT ELECTRICAL PERMIT APPUCAT/ON IF YOU QUALIFY FOR AN OTC ELECTRICAL PERMIT. <br /> AGREEMENT:I hereby certify that I have read and examined this application and know the same to be true and correct All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not The granting of a permit does not presume to give <br /> authority to violate or cancel the previsions of any other state or local law regulating construction or the performance of construction. That I am <br /> authorized by the owner of this property to perform the work for which application is made and I comply with the State Contractors Law 18.27 <br /> RCW and 296.200 WAC. <br /> Coy of Everett Official Use Only <br /> TED ELECTRICAL PERMIT <br /> ,# <br /> �� o��/C/zv/8' E t Za� o- <br /> Owner/ Agent Signature Date (Revised 2016) <br />