<br /> , PROJECT SPECIFICATIONS (continued)
<br /> x
<br /> SECTION 08710-DOOR HARDWARE SECTION 09680-CARPET SECTION 15500-HEATING,VENTILATING,AND AIR CONDITIONING °-.<
<br /> Summary: I. Provide hardware for swinging and sliding doors per drawings and this specification. Products: 1. Products:Refer to Section 01020-Allowances. Summary: 1. Modify,relocate and extend existing equipment,systems,and controls for heating and
<br /> Products: 1. Products:As selected by owner complying with the following Ref to Section 01020- _ 2. Carpet Installation Method:Teckless mounting with carpet cushion installation.Ripple commotion including gas piping, 7
<br /> `
<br /> ances
<br /> - - Allow . rubber cushion,for heavy traffic.Provide edge guards.Adhesives,cements and fasteners. 2. Coordinate with Owner's room uses to provide adequate system for all mnnact areas. •time_. aroduetRequtremmce: •i- s. _
<br /> 3. Coordinate location of thermostats and controls with Owner's requirements.
<br /> a. Materials and Application:ANSI A156 series standard. Installation: L Comply with requirements of Section 01000-Project Requirements. 4. Coordinate location of ductwork to avoid interference with location of designated lighting
<br /> b. Quality Level:Residential. 2. Ocean with tight seams and carpet grain running in same direction. fixture locations.Notify architect of required architectural elements to conceal ductwork -
<br /> 3. Hardware Finishes:Oil rubbed bronze(US 10B). such as lowered ceilings or softs.
<br /> 4. Locksets and Latcbsets:Cylinder type,privacy function at allbedrooms. SECTION 09900-PAINT AND STAIN 5. Do not out structural elements without prior written approval.
<br /> 5. Lock Cylinders:Interchangeable type. Summary: 1. Provide painting and surface preparation for interior and exterior o
<br /> 6. Hinges and Butts:Full-mortise type with non-removable pins at exterior,entrance unfinished suffices as scheduled. Design I. Modify,relocate and extend existing forced air heating system and service to
<br /> doors. 2. Provide painting and surface preparation of exposed mechanical and electrical piping, accommodate new work,including new materials suitable for service intended complying '3
<br /> 7. Closers:Low frequency,hinge type. conduit,ductwork,and equipment with approved submittals. ,g
<br /> 8. Stops for each door. 3. Provide repainting and surface preparation at areas of remodeling
<br /> 9. Flush bolts with dustproof strikes. - 4. Provide painting of entire surface where patch painting is required Submittals: I. Submit product data,warranties,operating and maintenance data 2
<br /> 10. Interior pocket door hardware:Stanley heavy duty. §.
<br /> 11. Sound-saippeg @ bathroom doors. Submittals: I. Submit product data,samples,4 foot by 4 foot mockup of each color, Products: I. Provide new materials suitable for service intended complying with approved shop g
<br /> 12. Weather-stripping at all doors to unheated spaces:pressure seal neoprene type. extra stock consisting of l unopened gallon of each type of paint used. drawings.Provide accessory items such as controls,anchors and insulation.
<br /> 13. Threshold:lalerlooldog,aluminum with bronze finish.
<br /> Products: I. Precincts:B jamin Moore,Sherwin Williams,Kelly Moine,Parker,Cabots or approved Installation: I. Comply with requirements ofSadon 01000-Project Requirements. •at
<br /> Installation: I. Comply with requirements of Section 01000-Project Requirements. equal, 2. Comply with applicable codes,regulations,ordinances and requirements of authorities
<br /> 2. Comply with DEH"Recommended Locations for Builder's Hardware"and hardware 2. First-fine commercial-quality products for all coating systems. having jurisdiction and SMACNA recommendations. N
<br /> manufacturers instructions. 3. Conceal piping and ductwork in living spaces. o4
<br /> 3. Ref to the door specifications and plans for hardwarefinetions. Installation: I. Comply with requirements ofSection01000-Project Requirements. 4. Center ceiling-mounted elements in center ofceiling tiles as applicable. in
<br /> END DIVISION 8 2. Provide field-applied mock-ups of each color and finish selected on actual surfaces to be 5. Maintain indicated fire ratings of walls,partitions,ceiling,and floors at penetrations. rev
<br /> painted.Test sample area for adhesion for each type of paint. Seal with firestopping m maintain fire rating
<br /> 3. Sand before painting until smooth and flat and sand between coats 6. Insulate piping and ductwork.Provide vapor barrier on insulated piping operating below N v
<br /> 4. Recant areas which show bleed-through or defects. 60 degrees F.
<br /> DIVISION 9-FINISHES 5. Remove cover plates and protect hardware and adjacent surfaces. 7. Locate floor grills 4"from finished wall,oras directed to clear drapes. c$ g
<br /> 6. Apply paint to achieve manufacturefs recommended dry fiMthicknesses. 8. Test all systems for proper operation. O try
<br /> SErd
<br /> SECTION 09255-GYPSUM BOARD ASSEMBLIES 7. Paentire surface where patch painting is required. 9. Commission and balance systems. ti M
<br /> Summary: 1. Provide Gypsum Board Assemblies: 8. Clean paint spatter from adjacent surfaces and glass. 10. Instruct Owners personnel in proper operation of systems. rn ,
<br /> a. Interior walls,partitions,and ceilingsfor and compound finish 9. Touch-up damaged surfaces at completion of construction. ®®®< co
<br /> tape an J Poan
<br /> b. Insulation and vapor barrier systems in gypsum drywall systems. END OF DIVISION 15
<br /> c. Cementhieus hooker anita foe appfoosion of rile. INTERIOR PAINT SCHEDULE ElI1111[Mtrtra
<br /> d Remodeling gypsum drywall systems at areas of new construction. • Gypsum Drywall Walls and Ceilings Satin(1 step up from flat)finish 1 coat latex primer,2 coal acrylic -
<br /> 2. Gypsum Board Attachment: finish. ❑DIN k = ex
<br /> a.
<br /> Gypsum board nail-attached to wood Earning and furring. • um GypsDrywall Walls and Ceilings in Bathrooms and Laundry:Semi-gloss(l step up from satin).1 coat DIVISION 16-ELECTRICAL C.1
<br /> - latex primer,2 roam acrylic finish. • s1 c.'
<br /> Products: I. Gypsum Board: • Wood for PahaedFinish(typical):Satinfinish(submit sample):l coat acrylic enamel undercoat(if not pre- SECTION 16000-ELECTRICAL On 0c
<br /> • a. Gypsum Wallboard:ASTM C 36,1/2 inch @ framing 16"o.c,1/2 inch"sag- primed material),2 coats acrylic enamel. Summary: 1. Modify,relocate,and extend existing electrical systems as required to 'b Ko
<br /> resistant"ceiling board @ rooflceiling framing 24"o.c.5/8 inch. •• Wood for Transparent Finish(iifnotpr fan:shed by millwork supplier):Satin Gloss.1 coat barite sealer, accommodate new work: yam„
<br /> b. Water-Resistant Gypsum Backing Board:ASTM C 630,regular and fire-eared 2 coats catalyzed laquer at VG fn millwork and doors.I coat stain and 2 ovals catalyzed laquer at a. power. (Sy
<br /> types,1/2 inch typical thickness. hardwood b. Lighting interior and exterior.
<br /> c. Joint Treatment:ASTM C 475 and ASTM C 840,3-coat system. c. Power,telephone/interne,cable TV and data outlets and wiring.
<br /> d Spiny Texture Finish. EXTERIOR PAINT SCHEDULE d. Lightning protection 3
<br /> e. Installation Standard:ASTMC 840. • Lctertor Wood Trn"m,Soffits,Facia.W d Doors.Frame:Low Sheen.I coat exterior alkyd primer,2 con¢ e. Provide for electrical permit. _
<br /> 2. Cementifious Backer Units for application of tile on floors and wet areas: ANSI A acrylic finish. E Coordinate with owner's security supplier/installer. i
<br /> 118.9,cement-coated Portland<emem panels 1/2 inch nominal. • Wood Siding Previously finished surfaces-l coat solid acrylic methane wool stain.Unfoisbed or 2. Coordinate(ocaaon of ductwork avoid"interference with location ofdaignated
<br /> 3. Trim Accessories:Metal trim.Coeeedead,edge trim,and control joins. preprmed surfaces-2 coats solid acrylic urethane wood stain.Rodda:'Sharkskin or approived equal. lighting fixture locations. ria
<br /> a. Auxiliary Materials:Gypsum board screws,ASTM C 1002.Gypsum board nails, • Exterior Exposed Timber Framing raid Decking:2 coats(all sides)semi-solid oil or alkyd base stain 3. provide connections for appliances and mechanical equipment env
<br /> ASTM C 514.Concealed acoustical sealant.Mineral fiber sound attenuation • Ferrous Metal:Low Sheen.lcoat,rust-inhibiting primer,2 coats acrylic finish. 4. Do not cut structural elements without prior written approval.
<br /> blankets. • Gahm:MedMetal:Low Sheth.I coat,galvanized metal primer,2 coats acrylic finish. rn
<br /> • PrefinishedAluminum:Low Sheen.2 toes acrylic finish. Existing Service: I. 200 amp(in basement).Relocate and upgrade as indicated or required
<br /> Installation: I. Comply with requirements of Section 01000-Project Requirements. - m
<br /> 2. Comply with standards referenced above and ASTM C 840 and GA 216. Submittals: I. Submit product data,warranties,operating and maintenance data,circuit h
<br /> 3. Provide acoustical sealant at plates,openings. END-DIVISIONS diagrams. en
<br /> 4. Install gypsum board assemblies true,plumb,level and in proper relation to adjacent 2. Submit electrical permit.
<br /> surf E.
<br /> 5. Provide 3-coat joint treatment such that,ager finishing,joints are not visible. Prodms: I. Provide new materials suitable for service.intended complying with e
<br /> 6. Seal with 1 coat of PVA sealer in compliance with State Energy Code regtdemens for DIVISION IU-SPECIALTIES approved submittals.Provide accessories such as<ontrols,cover plates,
<br /> vapor barriers.Apply a"orange-peel"spray texture with 80%coverage(provide sample and connections to equipment,white U.N.O.See Fuvue Schedule below.
<br /> wall in inconspicuous location for architect's review before spaying remainder ofjob)to SECTION 10800-TOILET AND BATH ACCESSORIES
<br /> all areas except those noted for wellpaperfinish. Summary: I. Provide toilet and bath accessories and wood framed minors/medicine pbinNs Installation: I. Comply with requirements of Section 01000-Project Requirements.
<br /> 2. Comply with applicable codes,regulations,ordioances rod regcieemens of
<br /> SECTION 09300-TILE Products: I. Products' authorities haviogjseisdiction and National Electrical Code.
<br /> Summary: I. Provide tile the following applications: 2. Toile Accessories:Damm."Pamm"series.bashed nickel finish o
<br /> f
<br /> a. Wall tile over gypsum wallboard- a. Paper Holder,single roll install on side wall(right side,except left side when no 3. Provide core drilling as required for new work .
<br /> b. Wall tile over cement backer units at wet areas. 4. Lanoallres,switches
<br /> andrmptingsas sho ~
<br /> wall on right side). 5. Layout fixtures.switches and receptacle as shown on plans.Review/confirm
<br /> c. Floor file over cement backer units. b. Double Towel Bar,24":I at Basement Bath over bench. layout with architect and owner in field prior to installation. o
<br /> d. Floor tile over electric radiant he . Robe Hoek:Mount on interior side of door.at top rail. ,y
<br /> sting system over cement backer this.See also6. Coordinate location of6aming to avoid interference with designated lighting
<br /> section 15000. e. IS"Towel Bar:1 al each side of Basement and Powder Hath lavatory conmec fixture locations.
<br /> • f. Shower Curtain Rod(at Basement Bath):Brushed Nickel. m
<br /> Products: I. Tile Materials:ANSI A 118 series standard specifications.As selected by owner. 3. Frameless Mirrors:es indicated on drawings. 7. Center ceiling-mountedthermostats
<br /> elements in center ofheslwh tiles p icableable. '.� a
<br /> Matching trim units.Ceramic soap dishes. Glazing:Mirror glass,1/4 inch thick(6 mm),polished edges,ASTM C 1036. 9. Gunn aunt multiple
<br /> entered eg to atio s.Moest multipleulti applicable.
<br /> bio.
<br /> 9. Gang-mount multiple switching locations.Moan types of control as
<br /> 2. Setting Materials:I.mez-Portimd cement mortar,ANSI A118.4.Cementitious file backer b. Type:Frameless. • close together as possible and in-line with each other at uniform height above _ C
<br /> board,ANSI A118.9.Grout:Latex-POnland cement grout,ANSI A118.6. - finished floor unless noted otherwise. - 8c 8'S o I
<br /> 3. Sealant:One-part mildew-resistant silicone sealant for non-nailc areas. Installation: 1. Comply with requirements ofSection01000-Project Requirements. 10. Group multiple junction boxes,telephone and electrical outlets together on
<br /> rt a35
<br /> 4. Radiant heating system:"Sun Touch"Mat System. walls.Avoid back-to-back box locations. a e.g;g
<br /> END OF DIVISION 10 11. Maintain indicated freesings of walls,partitions,ceilings,and floors at 9ji$ 3 k
<br /> Products: I. Tile Materials:ANSI A 118 series standard specifications.See schedule below.Matching penetrations.Seal with fire-stopping to maintain fire rating B 1 0' a
<br /> mm units. DIVISION 15-MECHANICAL 12. Provide power to all mechanical equipment and appliances as required. a ,0 ar:'
<br /> 2. Setting Materials:Latex-Portland cement mortar,ANSI A118.4.Cementi[ious file backer 13-. Test all system for proper operation. 1e E„ •
<br /> board,ANSIA118.9.Grut:Latex-Portland cement grout,ANSI A118.6. SECTION 15400-PLUMBING 14. Label circuits in electrical panels. .0 9.11c
<br /> 3. c.,lmm-"Impregnator 511"satin finish,or approved equal. Summary: - I. Provide complete plumbing,waste,and vent systems for the following: 15. Inam<t Owner's personnel in proper operation of system. 9 L. o
<br /> 4. Grouting Materials: a. Toilets and bathroom. Ica ',w-e Sic
<br /> a. Sam-Portland Cement Grout:ANSI A118.6. b. Laundries.
<br /> b. Commercial Portland Cement Grout:ANSI A118.6. c. On-demand gas hot water heater. Fixture Refer to Floor Plans and Electrical Fixture Symbols Legend on Sbeet E1.1. 11'5ag
<br /> c. Dry-Set Grout:ANSI A118.6. • 2. Do not cut structural elements without prior written approval. Schedule: 1. Recessed Cans:Juno Universal or equal.LED lamps substimud for RI 9'y 8 ,0
<br /> d. Latex-Portland Cement Grout:ANSI A118.6. c C S
<br /> Submittals: 1. Submit product data,piping types by application,warranties,operating a.Typical:6",No27C-WH24 trim(clear el00(,substitute equivilmd LED - Cr° o,m o 3
<br /> 5. Setting Accessories: and maintenance data. lamop for 65W PAR 30 incandescent.
<br /> a. Cementiticus Backer Unix:ANSI A118.9. b.Wall Washer.6"Universal,No261-WH(white baffle),LED lamp equivilant
<br /> b. Waterproof Membrane:Elastomeric membrane meeting ANSI A108 and A118. Products: I. Modify,relocate and extend existing plumbing system and service to accommodate new to 65W PAR 30 incandescent
<br /> For installation over concrete or cement backer board.Custom"Redgard", work,including new material suitable for service intended complying with approved c.We[-lacatiom-Showers:6"Universal,09702(luminous collar),No.21 trim
<br /> Merecrete"Hydroguard l",or apprived submittals.Provide accessory materials such as hangers and pipe insulation.Provide d.4"recessed fixture:17C-WH(clear alzac),with LED lamp equivilan[m
<br /> c. Setting Bsn005:Plastic buttons. fixtures complying with water consumption requiremens and accessibility acquirements. PAR20 inrandeseant
<br /> •
<br /> d. Sealer for Floors:Colorless,slip-and stain-resistant sealer. e.Recessed Wall"Step Light":Juno Mini LED Sup Light(Outdoor)838 LED.
<br /> Installation 1. Comply with eequuemems of Section 01000-PjectRequiremens. 3000K,Bronze finish,1C115LEDHSG housing 2.
<br /> Schedule: 1. Foyer,Rm Room,and Wine Cellar Floors:
<br /> 2. Comply with applicable codes,regulations,ordinances and requirements 'of authorities Strip Fixtures(length per plan):
<br /> Large format porcelain or stone tile,allow$3ls.f.for tile.Set with thinset latex modfiedhaving jurisdiction.Vent all fixtures. a Closes:floutescent,single tube T8,programmed start,mounted above inside
<br /> cement mortar over emit prevention membrane.Latexportland cement grout 3. Conceal all piping. door heed. U
<br /> 2. Basement Bath Comm Top and Backcplesh: 4. Maintain indicated fire ratings of walls,partitions,ceilings,and floors at penetrations. 4. Under-cabinet Flaurescen[Fixture:Iwo 22",14W 15 HE 3000K tamp,
<br /> Allow$8/s.E for tile.Install with tense latex modified cement mortar over water Seal with firestopping ro maintain fire rating. Appliance White. "0 s•r N M
<br /> resistant gypsum wallboard at walls and over/4"backer board over(4"plywood at 5. Coordinate location plumbing system to avoid interf nce with location of designated 5. Track Lighting:luno line voltage track system with open back spot lamp holders O N N
<br /> counters.Latex rtland cement grout for 50 wan halogen lamps. E N Op
<br /> P° lighting locapepp 4. Surface Mounted Fixtures: - N•,--m " 0,
<br /> S. Laundry Room Omeett To be selecteder owner(allow$8/s.E for file)Insall with 6. Test all system for proper operation Foyer Pendant:Allow$250. N'w Q
<br /> thmset latex modified cement mortar over water resistant gypsum wallboard latex 7. Instr.Osmes personnel in proper operation ofsystem. a. yet
<br /> poxjand cement grout c. Bathroom Wall Sconces:allow 5150 each. 0 I•Z,a/ "0
<br /> Dann ni
<br /> Fixture Kohler fixtures,white,U.N.O.Danm,brushed nickel fresh,U.N.O. d. Ceiling Fixtures:allow 1100 each. 0 0
<br /> Installation: 1. Comply withsequirmums of Seceica 01000-Project Requirements. Schedule: I. Master Baden Under-counter Mounted Lavatories(Phase 2):Kohler"Ladena"K-2215, e. Exterior wall Sco1ces:allow 5150 each CI 'J_ O
<br /> 2. Comply with ANSI l08 series standard specifications and Tile Council of America, vitreous china,white.Dante"Patau"D221558BN single handle counter mount 5. Exhaust Fans:Panasonic"Whipsper-Quiet Series',(as indicated ondeswmgs) 4P'
<br /> Handbook for Ceramic Tile Installation. fauceeim. with 4"or6"vent duct as required.Review exterior vent locations with architect O •-t In ,
<br /> 3. Layout thein grid panem with alignment of grids,to provide uniform joint width,and to 2. Toilers:TOTO Drake IL CST454CDF,two piece,128 GPF,high profile(ADA)toilet an she before installing 7 en L,
<br /> minimize coding.Review layout with architect prior to installation. with upgraded"Oval Soft Close"seat 6. Door Chimes:Nutone WirelessI.A600 WH(white)with 128MB memory. H
<br /> 4. Grout.cure,clean and seal tile surfaces. 3. Master Bath and Powder Bath Shower(Phase 2): 7. Accessories:Provide related accessory materials as required for complete 0 V tr'y
<br /> a.
<br /> Wedi Fundo floor drain for tile/Fundo Shower System Assembly or mud pan operable system. Q _
<br /> SECTION 09550-WOOD FLOORING installation,stainless steel. -
<br /> Products: 1. Hardwood Strip Flooring:Match existingte"
<br /> solid wood strip flooring with tongue and S. Shower/Controls:DanParma"0500558514 single handle shower control with END DIVISION 16- _
<br /> groove in arras with existing hoardwwod flooring.Swedish finish.Matching trim, 3 function showerhead.All brushed nickel finish
<br /> thresholds,and reducer strips. Hand-held shower spray:Dante D465005BN 3-function 24"slide bar assembly.
<br /> 4. Master Bath Tub(Phase 2):Acrylic oval soaking rob,Atlantis 3660"Petite",60"x 36" ,
<br /> Installation: I. Comply with requirements of Section 01000-Project-Requirements. x 23"soaking rob,drain and overflow kit Dante`Parma"D30578BN Roman Tub
<br /> 2. Blind nail-down installation at wood sub-floors. Faucet.
<br /> 5. Powder Bath(Phase 2)and Basement Bath counter mounted Lavatories:K-2905 -
<br /> "Farmington"vitreous china,self rimming.Daoze"Puma"D225558BN single handle
<br /> SECTION 09660-RESILIENT FLOORING counter mounted faucet/trim.
<br /> Products: L Sheet Flooring:Ref to Section 01020-Allowances.Light commercial grade.Heat 6. Basement Bath Tub/Shower.Fiberfab 4101 60'436"x77"fiberglass tub/shower mit,or
<br /> welded seams.Provide edge snips and terminations. approved equaL Dame"Parma"D50005813N single handle pressure balance tub di
<br /> showerfaucet,brushed nicktermounteedmold assembly. :'15 r1 Al.4
<br /> Installation: I. Comply was requremms of Section 01000-Project Requirements. 7. IanndryNtilt,Sinks:nickel mounted molded fiberglass,single basin,white.Muster
<br /> 2. Prepare surfaces by cleaning,leveling and priming. "Model IO",9671031000019 ore equal Allow$150 for nim.
<br /> 3. Level to t/S:mob in JO feet tolerance. 8. "On-Demand"Hot Water Heater(gas):Sized for fixtures serviced,A.O.Smith,Rheem,
<br /> •
<br /> ..
<br /> 4. install tile with tight joints and required patterns. Se approved equal.
<br /> "-'-- 9. Accessories:Provide related materials as needed for complete operable system.