My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/07/03 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/07/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 9:37:25 AM
Creation date
7/9/2019 9:36:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> *Shoreline Public Access Project Summary <br /> Shoreline Section Status Participants Cost 1 2 3 <br /> Motes <br /> 1.0 Edgewater Beach at Completed City,Port, $$$ <br /> X Parking,beach access,benches,Port-a Potties <br /> Boeing Pier Others $ <br /> $ x Gravel access road to BNSF storage vard with <br /> 1.3 fiarborviewPark�d�acent Gomoleted BNSF locked oate:lacksrati crossing <br /> road <br /> Rehab bridle over RR and restored nearshare <br /> 1.5 Howarth Plc Access Bridge Completed Cifvr` no RC Co. X and beach <br /> and Beach Restoration <br /> 2.1 Pigeon Creek No.1 Design study City,Port, $$ <br /> X Unfunded project in City's TIP <br /> Over/Underpass across completed BNSF <br /> BNSF to beach Port closes 1 mi paved trail at night for securely <br /> Te <br /> 2,2 Te Terminal Ave.n Creek#1 to Completed Port,City $$ X at pocket beach with picnic tables and benches. <br /> 25th St overcrossing of Marine View Dr.; . <br /> Vi <br /> St..Marine View Dr.r. <br /> 2.3 Terminal Ave.to Completed. Port,City $$ X sidewalks and other ped improvements <br /> overcrossing <br /> 2.4 Bond St/Hewitt Ave.street On-going BNSF,City $ <br /> X Under litigation to restore public access <br /> end oadc negotiations <br /> Port,City $$ X Widened ped/bike on west side of W.Marine <br /> 3.1 Harbor Trail to N.Marina Completed View Dr.(Everett Av-23rd St) <br /> X Phase 1 completed with walkways and deck <br /> 32 Bayside Park Improvements Completed City,Others $$ overlook;Phase 2 not funded <br /> X X Phase 1 done;Phase 2 under construction;Phase 3 <br /> 3.3 North Marina master plan Under Port $$ going to bid for construction <br /> (Waterfront Place) construction <br /> Po x Construction to be completed in 2019 <br /> 3.4 Grand Ave Park overpass Under Ci�'� � $$$ _ <br /> to waterfront construction BNSF <br /> City X 1 mile ped/bike paved tfail connects north and <br /> 3.5 Marine View Drive Trail Completed south view parks <br /> (portion of Mill Town Trail) <br /> 4.1 City Utility Building <br /> City $ X <br /> 4.2 Elevated Wooded Area <br /> Others $ x Potential stop on Mill Town Trail <br /> 4,3 Jeld-Wen to Railroad Completed City,Port,BNSF $ X <br /> Gravel parking area with access to mud flats <br /> Service Road <br /> Port $$ Possible future view point when property <br /> 4.4 Baywood Spur developed <br /> 4.5 Sidewalk Trail Completed City 1 $ <br /> X Mill Town Trail shares sidewalk <br /> 4.6 North Point <br /> City,BNSF $$$ x Trail alternatives includes boardwalk over water <br /> City,Port, $$$ X Possible future trail when property redeveloped <br /> 4.7 Weyerhaeuser SiteOthers <br /> 4.8 RR Delta Crossing <br /> City,BNSF $$$ x,. Overhead ramp crossing of RR With throw fence <br /> 4.9 Bridge Entry to former <br /> City,BNSF $$ Possible future trail when property redeveloped <br /> Weyerhaeuser site <br /> 2 <br /> Shoreline Public Access Plan Update 2019 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.