My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/07/03 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/07/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 9:37:25 AM
Creation date
7/9/2019 9:36:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Plan Section 1 <br /> Implementation <br /> Several steps are necessary to successfully implement the Section 1 trail linking Howarth <br /> Park with Pigeon Creek No. 1. Feasibility of the construction of an all-weather trail will be <br /> determined based on current best available data. The narrow area for trail construction may <br /> necessitate that it be built on pilings and some portions may have to be built in the railroad <br /> right-of-way. Inwater work(waterward of the Ordinary High Water Mark)faces stringent <br /> permitting conditions unless it is clear that the ecology will benefit and the use is appropriate. <br /> Another key step will be to acquire property or easement rights for those tidelands in private <br /> ownership. Support and permission from the railroad is essential to creation of this trail <br /> section along the waterfront. During construction, environmental clean-up of contaminated <br /> sediments and beach restoration could be accomplished. <br /> Shoreline Public Access Plan Update 2019 9 <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.