Laserfiche WebLink
I , <br /> ;�: :, ..�w : i � 4 x y� st�.k . � >3.:` .:1 3 :. • � t ��� ,� �3� �"�l `.a,�'����`��� +, �,^v�t > Z� z�a� <br /> � y sir ah4 `. �� a � � >3 .� �: .. >� ;r •� �-� �� s�> ��. ., a> °^ a 'T `.k�' t�"" � ,�.� <br /> ....`c,-1. z �.• .F ra z xi Yt � a� M VOR <br /> O. <br /> XX ,.�. r '�i;�.��+��:..-..L� >:r�� ���;•�"s��•.�� �� �€�., � �..�c�z��,,.,.-�`�.���a�c'eex't�c�'�r �iE �..�'�x ��t.�� �� � v3 �: ',.,�. <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii, iii,or v)is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> 0 (a) Electrical plan review is not required for: <br /> (i)Low voltage systems; <br /> f—❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> 1 0 (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii) For installations in(a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> --►❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed;and <br /> (D) Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical,dental,and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> ❑ (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this chapter. <br /> ❑ (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> 1.410.490€ 74.0, <br /> 14OfF.1i::*t`ersaifaf rare:4.ili0es: <br /> 0u+rfoflaf*a.�lt��� cm3�acetE0e�1%`�a�es e#`r">taeeri�x�3t or tlt£i?�r raciiitie's' <br /> 14sa1 h4rPer on$Care;F.aetitty .#eta Re eti <br /> 0.401.4*- ttitca#3orta t t stutttse#i Irl <br /> p[a It hrre�lrr <br /> Pospitaf Yes I3tf erT li tiefaes. Required <br /> Afcirsi is fiance,tlr4jt b kong=t¢rn Yes Ertck t€rna1 Yep <br /> care tri} ) s tt isa;l es <br /> ,Bearding:borne :Yes <br /> ,Hssssted h et fa..€sty} Yes <br /> €+tive2eeicoholasm hosp€tal• Yes 444f4°t', tis 0Cd 1 a1xd.9dp . <br /> °r va g psucfsiatrieho5prtat: e. kf sAc, 44.thbra•;.0-Ito(3d 1geci egt:ak 5pe t"1g s: <br /> tr'clkestitije;taorne, Yes mayregwre pt•4o+7evtew oit facEI€ty types rtgt <br /> 5 later osti a;-yfacU tf Y.e ra ewe by the•sd:epattment: <br /> €Febial:%etris s aly,is tr Yes <br /> kesidentia[tseatre ntfati* '. 'Yes <br /> E ltie?tecF ervace 400ty Yes; g1)I/ l 1 <br /> adult res€dntil:relxa1511tif€on Yes PERMIT# l l� Page 2 of 3 <br /> enter <br />