Laserfiche WebLink
• r +.; �._. s k 3 (i =�� {�...n '■/,qS pp yah` x _ ti yrs ��r+ri� fie 2� a'.r ,,� + <br /> o l a L" 9eRx 2 6 6 V1 �� Llm CT RI fel"•! r ,3A 4n. err `� lx t- i �.� i t <br /> a r �::.tt C,aa,�„ 3 ? a. �,.a L.,'t` 3 ; Wiz`x .� wry k.'. 1 sa�k, ''�*t x i t> far ! �'i�'.�: 1`>.„MsNt <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii,iii,or v)is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> 0 (a) Electrical plan review is not required for: <br /> ❑ (i)Low voltage systems; <br /> 4--0 (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> ❑ does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> 411 0 (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> • (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii)For installations in(a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> —►❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are,providing both before and after panel schedules as needed;and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical,dental,and chiropractic clinic”of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this chapter. <br /> 0 (c)1f a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> -rAreg.¢[r- ale tI 2 <br /> 1¥ atttl i>'X t c SOSial.case V4Ft J es rc rani an:d,fn0t1#1.4n 1 Facr1itrea P ac ea ui"44ssaxi bIyr=ctr tither Fa Mees <br /> t teatth flr Personal Carectlit <br /> sa¢{4C <br /> Resole/ ales tl her f a i1i ytres; Le0104 <br /> B'toirp ipit pi aPtpr e.terry Yes • ti na Yep: <br /> carevisift )05( i:'rizttai <br /> Hgarc7rag Enostre Yes <br /> Asses€ed he<thg gaff6i Yea <br /> i ivate akehc(ism itespit:at Yes .ss 7Ctx.`'a} 4 9001 14iid o, Q , <br /> 0*,ar'e'4`9 ,ta:tiotp t v '1,A:V:av 413,kdto rie'iN rrceF,r p.tc�ns <br /> Materefig harne 'es ma}Ya of e i �f .4iii,eW qri faciiitrtypes nat <br /> A nbtlafor,s&rge'Y;€acriit+j Yes r rlexy a by lt€� ep�rtrraeajf. <br /> Btenel hemodialy5isdinic Yes <br /> T2s[deri#iafti.e hia4bt1aeiiti Yt <br /> Enhanced.aerrice f €sty. Yes, <br /> rg¢ultre'sic{etttiAr4€ehtlitatiO Yes PERMIT# Page 2-Plan Review <br /> can* <br />