My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Tier 2 I <br /> Approval Requirements The Reclamation Facility shall have a Quality Control <br /> Plan (QCP) in accordance with WSDOT QC 9"Standard <br /> Practice for Approval of Reclamation Facilities of <br /> WSDOT Recycled Concrete and Returned Concrete". <br /> The Reclamation Facility's QCP shall be submitted and <br /> approved by the WSDOT State Materials Laboratory. <br /> Once accepted,any changes to the QCP will require a <br /> new QCP to be submitted for acceptance. <br /> Evaluation of aggregate source properties(LA Wear and <br /> Degradation)for the recycled concrete aggregate is not <br /> required. <br /> Acceptance Requirements Certification of toxicity characteristics in accordance with <br /> Section 9-03.21(1), required if requested. <br /> Field acceptance testing in accordance with Section 3-04 <br /> is required. <br /> Provide certification in accordance with WSDOT QC 9 for <br /> every lot. A lot shall be no larger than 10,000 tons. <br /> Approved to provide the following Aggregate Materials: <br /> Tier 1 aggregate materials <br /> 9-03.1 Coarse Aggregate for Commercial Concrete or Concrete class 3000 <br /> 9-03.9(1) Ballast <br /> 9-03.9(2) Permeable Ballast <br /> 9-03.9(3) Crushed Surfacing <br /> 9-03.12(1)A Gravel Backfill for Foundations Class A <br /> 1 <br /> Tier 3 <br /> Approval Requirements The Reclamation Facility shall have a Quality Control <br /> Plan (QCP) in accordance with WSDOT QC 10 <br /> "Standard Practice for Approval of Reclamation Facilities <br /> of Recycled Concrete Aggregates from Stockpiles of <br /> Unknown Sources". The Reclamation Facility's QCP <br /> shall be submitted and approved by the WSDOT State <br /> Materials Laboratory. Once accepted, any changes to <br /> the QCP will require a new QCP to be submitted for I <br /> acceptance. <br /> Evaluation of aggregate source properties (LA Wear and <br /> Degradation)for the recycled concrete aggregate is <br /> required. <br /> Acceptance Requirements Certification of toxicity characteristics in accordance with <br /> Section 9-03.21(1) is required. <br /> Field acceptance testing in accordance with Section 3-04 <br /> is required. <br /> Provide certification in accordance with WSDOT QC 10 <br /> for every lot. A lot shall be no larger than 10,000 tons <br /> Approved to provide the following Aggregate Materials: <br /> Tier 1 aggregate materials <br /> 9-03.1 Coarse Aggregate for Commercial Concrete or Concrete class 3000 <br /> 9-03.9(1) Ballast <br /> 9-03.9(2) Permeable Ballast <br /> City of Everett Page AM-88 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.