My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Section 9-20, Concrete Patching Material, Grout, and Mortar I <br /> 2 January 7, 2019 <br /> 3 9-20.1 Patching Material I <br /> 4 This section, including title, is revised to read: <br /> 5 <br /> 6 9-20.1 Patching Material for Cement Concrete Pavement <br /> 7 Concrete patching material shall be prepackaged mortar extended with aggregate. The <br /> 8 amount of aggregate for extension shall conform to the manufacturer's recommendation. <br /> 9 <br /> I <br /> 10 Patching mortar and patching mortar extended with aggregate shall contain cementitious <br /> 11 material and conform to Sections 9-20.1(1) and 9-20.1(2). The Manufacturer shall use the <br /> 12 services of a laboratory that has an equipment calibration verification system and a I 13 technician training and evaluation process in accordance with AASHTO R 18 to perform all <br /> 14 tests specified in Section 9-20.1. <br /> 15 <br /> 16 9-20.1(1) Patching Mortar <br /> 17 Patching mortar shall conform to the following requirements: <br /> 18 <br /> Compressive Strength ASTM Test Method Specification I <br /> at 3 hours C 39 Minimum 3,000 psi <br /> at 24 hours C 39 Minimum 5,000 psi <br /> Length Change I I <br /> at 28 da s ' C 157 0.15 percent maximum <br /> Total Chloride Ion Content C 1218 1 lb/yd3 maximum <br /> Bond Stren.th <br /> I <br /> at 24 hours C 882 (As modified by C Minimum 1,000 psi <br /> 1 928, Section 9.5) <br /> Scaling Resistance (at 25 C 672(As modified by C 1 lb/ft2 maximum <br /> cycles of freezing and 928, Section 9.4) <br /> j thawing) I <br /> 19 I 20 9-20.1(2) Patching Mortar Extended with Aggregate <br /> 21 Patching mortar extended with aggregate shall meet the following requirements: <br /> 22 I Compressive Strength _ ASTM Test Method 1 Specification 1 <br /> at 3 hours C 39 Minimum 3,000 psi <br /> at 24 hours C 39 Minimum 5,000 psi <br /> I <br /> Length Change <br /> at 28 days C 157 0.15 percent maximum <br /> Bond Strength _ I <br /> at 24 hours C 882(As modified by Minimum 1,000 psi <br /> ASTM C928, Section 9.5) <br /> Scaling Resistance (at 25 C 672 2 Maximum Visual Rating <br /> cycles of freezing and <br /> thawing) <br /> Freeze thaw C 666 Maximum expansion 0.10% <br /> Minimum durability 90.0% I 23 <br /> I <br /> City of Everett Page AM-100 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.