Laserfiche WebLink
I <br /> I1 TABLE OF CONTENTS - SPECIAL PROVISIONS <br /> 2 INTRODUCTION TO THE SPECIAL PROVISIONS SP1-1 <br /> '3 DIVISION 1 : GENERAL REQUIREMENTS SP1-2 <br /> 4 1-01 DEFINITION AND TERMS SP1-2 <br /> I1-01.35 Definitions SP1-2 <br /> 6 1.02 BID PROCEDURES AND CONDITIONS SP1-7 <br /> 7 1.02.1 Prequalification of Bidders SP1-7 <br /> 8 1-02.4 Examination of Plans, Specifications, and Site of Work SP1-7 <br /> 9 1-02.5 Proposal Forms SP1-8 <br /> I <br /> 10 1-02.6 Preparation of Proposal SP1-8 <br /> 11 1-02.7 Bid Deposit SP1-10 <br /> 12 1-02.8 Noncollusion Declaration and Lobbying Certification SP1-11 <br /> I13 1-02.9 Delivery of Proposals SP1-11 <br /> 14 1-02.13 Irregular Proposals SP1-11 <br /> 15 1-02.15 Pre-Award Information SP1-12 <br /> I16 1-03 AWARD AND EXECUTION OF CONTRACT SP1-12 <br /> 17 1-03.1 Consideration of Bids SP1-12 <br /> I18 1-03.3 Execution of Contract SP1-12 <br /> 19 1-03.4 Contract Bond SP1-13 <br /> 20 1-03.7 Judicial Review SP1-13 <br /> 21 1-04 SCOPE OF THE WORK SP1-13 <br /> 22 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and <br /> 23 Addenda SP1-13 <br /> ' 24 1-04.4 Changes SP1-16 <br /> 25 1-04.5 Notice by Contractor SP1-18 <br /> I26 1-04.7 Differing Site Conditions (Changed Conditions) SP1-20 <br /> 27 1-05 CONTROL OF WORK SP1-20 <br /> 28 1-05.1 City SP1-20 <br /> I29 1-05.2 City's Representative SP1-21 <br /> 30 1-05.3 Working Drawings SP1-22 <br /> 111 31 1-05.4 Conformity with and Deviations from Plans and Stakes SP1-24 <br /> 111 32 1-05.6 Inspection of Work and Materials SP1-26 <br /> 33 1-05.7 Removal of Defective and Unauthorized Work SP1-27 <br /> I34 1-05.10 Guarantees SP1-28 <br /> 35 1-05.11 Final Inspections and Operational Testing SP1-29 <br /> ▪ 36 1-05.12 Final Acceptance SP1-30 <br /> 11 37 1-05.13 Superintendents, Labor, and Equipment of Contractor SP1-31 <br /> 38 1-05.14 Cooperation with Other Contractors SP1-31 <br /> I39 1-05.16 Water and Power SP1-32 <br /> 40 1-05.17 Oral Agreements SP1-32 <br /> • 41 1-05.18 Contractor SP1-33 <br /> City of Everett Page SP1-i Special Provisions <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />