My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 7-12.2 Materials SP7-21 <br /> 2 7-12.3 Construction Requirements SP7-21 <br /> I 3 7-12.4 Measurement SP7-22 <br /> 4 7-12.5 Payment SP7-22 <br /> in 5 7-14 HYDRANTS SP7-22 <br /> 6 7-14.1 Description SP7-22 <br /> 7 7-14.2 Materials SP7-22 <br /> I 8 7-14.3 Construction Requirements SP7-23 <br /> 9 7-14.5 Payment SP7-23 <br /> 10 7-15 SERVICE CONNECTIONS SP7-24 <br /> I11 7-15.1 Description SP7-24 <br /> 12 7-15.2 Materials SP7-24 <br /> I137-15.3 Construction Requirements SP7-24 <br /> 14 7-15.4 Measurement SP7-26 <br /> 15 7-15.5 Payment SP7-26 <br /> 1 16 DIVISION 8 - MISCELLANEOUS CONSTRUCTION SP8-1 <br /> 17 8-01 EROSION CONTROL AND WATER POLLUTION CONTROL SP8-1 <br /> I <br /> 18 8-01.3 Construction Requirements SP8-1 <br /> 19 8-02 ROADSIDE RESTORATION SP8-1 <br /> 20 8-02.2 Materials SP8-1 <br /> I21 8-02.3 Construction Requirements SP8-1 <br /> 22 8-02.4 Measurement SP8-4 <br /> 23 8-02.5 Payment SP8-4 <br /> I24 8-03 IRRIGATION SYSTEMS S P8-5 <br /> 25 8-03.1 Description SP8-5 <br /> ' 26 8-03.3 Construction Requirements SP8-5 <br /> 27 8-04 CURBS, GUTTERS,AND SPILLWAYS SP8-6 <br /> 28 8-04.1 Description SP8-6 <br /> I29 8-04.3 Construction Requirements SP8-7 <br /> 30 8-04.4 Measurement SP8-7 <br /> I31 8-04.5 Payment SP8-8 <br /> 32 8-05 ADJUSTMENT OF GAS VALVE BOX SP8-8 <br /> 33 8-05.1 Description SP8-8 <br /> I34 8-05.2 Vacant SP8-8 <br /> 35 8-05.3 Construction Requirements SP8-8 <br /> 36 8-05.4 Measurement SP8-9 <br /> I37 8-05.5 Payment -SP8-9 <br /> 38 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES SP8-9 <br /> I 39 8-06.3 Construction Requirements SP8-9 <br /> III40 8-06.4 Measurement SP8-9 <br /> 41 8-06.5 Payment SP8-10 <br /> I <br /> City of Everett Page SP1-v Special Provisions <br /> I <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.