My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 8-30.5 Payment SP8-41 <br /> 2 8-31 IMBEDDED STREET NAMES SP8-41 <br /> 1 3 8-31.1 Description SP8-41 <br /> 4 8-31.2 Materials SP8-41 <br /> I5 8-31.3 Construction Requirements SP8-43 <br /> 6 8-31.4 Measurement SP8-45 <br /> 7 8-31.5 Payment SP8-45 <br /> I8 8-32 TRANSIT SHELTER SP8-45 <br /> 9 8-32.1 Description SP8-45 <br /> 10 8-32.2 Materials SP8-45 <br /> 1 11 8-32.3 Construction Requirements SP8-45 <br /> 12 8-32.4 Measurement SP8-47 <br /> I13 8-32.5 Payment SP8-47 <br /> 14 8-34 BIKE RACKS SP8-47 <br /> 15 8-34.1 Description SP8-47 <br /> I16 8-34.2 Materials SP8-47 <br /> 17 8-34.3 Construction Requirements SP8-47 <br /> I <br /> 18 8-34.4 Measurement SP8-47 <br /> 19 8-34.5 Payment SP8-48 <br /> 20 DIVISION 9 - MATERIALS SP9-1 <br /> I21 9-03 AGGREGATES SP9-1 <br /> 22 9-03.22 Non-Shrink Cement Sand Grout SP9-1 <br /> 23 9-05 DRAINAGE STRUCTURES AND CULVERTS SP9-1 <br /> I24 9-05.12 Polyvinyl Chloride (PVC) Pipe SP9-1 <br /> 25 9-05.15 Metal Castings SP9-2 <br /> I26 9-14 EROSION CONTROL AND ROADSIDE PLANTING SP9-2 <br /> 27 9-14.1 Soil SP9-2 <br /> 28 9-14.6 Plant Materials SP9-3 <br /> 1 29 9-14.7 Stakes, Guys, and Wrapping SP9-3 <br /> 30 9-15 IRRIGATION SYSTEM SP9-4 <br /> I31 9-15.1 Pipe, Tubing, and Fittings SP9-4 <br /> 32 9-15.3 Automatic Controllers SP9-4 <br /> 33 9-15.5 VALVE BOXES SP9-4 <br /> I34 9-15.17 Electrical Wire and Splices SP9-5 <br /> 35 9-28 SIGNING MATERIALS AND FABRICATION SP9-6 <br /> 36 9-28.14 Sign Support Structures SP9-6 <br /> '. 37 9-29 ILLUMINATION, SIGNAL, ELECTRICAL SP9-6 <br /> 38 9-29.1 Conduit, lnnerduct, and Outerduct SP9-6 <br /> I <br /> 39 9-29.2 Junction Boxes, Cable Vaults, and Pull Boxes SP9-7 <br /> 40 9-29.3 Fiber Optic Cable, Electrical Conductors, and Cable SP9-8 <br /> 41 9-29.6 Light and Signal Standards SP9-14 <br /> City of Everett Page SP1-vii Special Provisions <br /> I <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.