Laserfiche WebLink
1 Complete penetration groove welds on plates 5/16 inch and thicker in the following welded <br /> 2 assemblies or Structures shall be 100 percent ultrasonically inspected: <br /> 3 <br /> 4 6-03.3(33) Bolted Connections <br /> 5 The first paragraph is supplemented with the following: <br /> 6 <br /> 7 After final tightening of the fastener components, the threads of the bolts shall at a <br /> 8 minimum be flush with the end of the nut. <br /> 9 <br /> 10 The following is inserted after the third sentence of the fourth paragraph: <br /> 11 <br /> 12 When galvanized bolts are specified, tension-control galvanized bolts are not permitted. <br /> 13 1 14 Section 6-05, Piling <br /> 15 January 2, 2018 <br /> 16 6-05.3(9)A Pile Driving Equipment Approval I <br /> 17 The fourth sentence of the second paragraph is revised to read: <br /> 18 <br /> 19 For prestressed concrete piles, the allowable driving stress in kips per square inch shall be <br /> 20 0.095 ,/f'� plus prestress in tension, and 0.85f'c minus prestress in compression, where f'c <br /> 21 is the concrete compressive strength in kips per square inch. <br /> 22 <br /> 23 Section 6-07, Painting <br /> 24 January 7, 2019 <br /> 25 6-07.1 Description <br /> 26 The first sentence is revised to read: <br /> 27 <br /> 28 This work consists of containment, surface preparation, shielding adjacent areas from work, <br /> 29 testing and disposing of debris, furnishing and applying paint, and cleaning up after painting <br /> 30 is completed. <br /> 31 <br /> 32 6-07.2 Materials <br /> 33 The material reference for Paint is revised to read: <br /> 34 <br /> 35 Paint and Related Materials 9-08 <br /> 36 <br /> 37 6-07.3(1)A Work Force Qualifications for Shop Application of Paint <br /> 38 This section is supplemented with the following new sentence: <br /> 39 <br /> 40 The work force may be accepted based on the approved facility. <br /> 41 1 <br /> 42 6-07.3(1)B Work Force Qualifications for Field Application of Paint <br /> 43 The first two paragraphs are revised to read: <br /> 44 <br /> 45 The Contractor preparing the surface and applying the paint shall be certified under <br /> 46 SSPC-QP 1 or NAGE International Institute Contractor Accreditation Program (NIICAP) AS <br /> 47 1. <br /> 48 <br /> City of Everett Page AM-40 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />