Laserfiche WebLink
1 f. Maximum dry film thickness for each coat. <br /> 2 <br /> 3 g. Minimum wet film thickness for each coat to achieve the specified minimum dry <br /> 4 • film thickness. <br /> 5 <br /> 6 6-07.3(2)D Hazardous Waste Containment, Collection, Testing, and Disposal <br /> 7 Submittal Component <br /> 8 The first paragraph (up until the colon) is revised to read: <br /> 9 <br /> 10 The hazardous waste containment, collection, testing, and disposal shall meet all Federal <br /> 11 and State requirements, and the submittal component of the painting plan shall include the <br /> 12 following: <br /> 1 <br /> 13 <br /> 14 6-07.3(2)E Cleaning and Surface Preparation Submittal Component <br /> 15 Item 1(b) of the first paragraph is revised to read:: <br /> 16 <br /> 17 b. Type, manufacturer, and brand of abrasive blast material and all associated additives, <br /> 18 including Safety Data Sheets (SDS). <br /> 19 <br /> 20 6-07.3(3)B Quality Control and Quality Assurance for Field Application of Paint <br /> 21 The last sentence of the first paragraph (excluding the numbered list) is revised to read: <br /> 22 <br /> 23 The Contractor's quality control operations shall include a minimum monitoring and <br /> 24 documenting the following for each working day: <br /> 25 <br /> 26 Item number 1 in the fourth paragraph is revised to read: <br /> 27 <br /> 28 1. Environmental conditions for painting in accordance with ASTM E 337. <br /> 29 <br /> 30 Item number 4 in the fourth paragraph is revised to read: <br /> 31 <br /> 32 4. Pictorial of surface preparation guides in accordance with SSPC-VIS 1, 3, 4, and 5. <br /> 33 <br /> 34 Item number 5 in the fourth paragraph is revised to read: <br /> 35 <br /> 36 5. Surface profile by Keanne-Tator comparator in accordance with ASTM D 4417 and <br /> 37 SSPC PA17. <br /> 38 <br /> 111 <br /> 39 6-07.3(4) Paint System Manufacturer's Technical Representative <br /> 40 This section is revised to read: <br /> 41 <br /> 42 The paint system manufacturer's representative shall be present at the jobsite for the pre- <br /> 43 painting conference and for the first day of paint application, and shall be available to the <br /> 44 Contractor and Contracting Agency for consultation for the full project duration. <br /> 45 <br /> 46 6-07.3(5) Pre-Painting Conference <br /> 47 The second paragraph is revised to read: <br /> 48 <br /> 49 If the Contractor's key personnel change between any work operations, an additional <br /> 50 conference shall be held if requested by the Engineer. <br /> City of Everett Page AM-42 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />