My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-07.3(10)A Containment <br /> 2 The first sentence of the third paragraph is revised to read: <br /> 3 <br /> 4 Emissions shall be assessed by Visible Emission Observations (Method A) in SSPC <br /> 5 Technology Update No. 7, Conducting Ambient Air, Soil, and Water Sampling of Surface <br /> 6 Preparation and Paint Disturbance Activities, Section 6.2 and shall be limited to the Level A <br /> 7 Acceptance Criteria Option Level 0 Emissions standard. <br /> 8 <br /> 9 6-07.3(10)D Surface Preparation Prior to Overcoat Painting <br /> 10 The first paragraph is revised to read: <br /> 11 <br /> 12 The Contractor shall remove any visible oil, grease, and road tar in accordance with SSPC- <br /> 13 SP 1, Solvent Cleaning. <br /> 14 <br /> 15 The second paragraph is revised to read: <br /> 16 <br /> 17 Following any preparation by SSPC-SP1, all steel surfaces to be painted shall be prepared <br /> 18 in accordance with SSPC-SP 7, Brush-off Blast Cleaning. Surfaces inaccessible to brush- <br /> 19 off blast shall be prepared in accordance with SSPC-SP 3, Power Tool Cleaning, as <br /> 20 allowed by the Engineer. <br /> 21 <br /> 22 The first sentence of the third paragraph is revised to read: <br /> 23 <br /> 24 Following brush-off blast cleaning, the Contractor shall perform spot abrasive blast cleaning <br /> 25 in accordance with SSPC-SP 6, Commercial Blast Cleaning. <br /> 26 <br /> 27 The second to last sentence of the third paragraph is revised to read: <br /> 28 <br /> 29 For small areas, as allowed by the Engineer, the Contractor may substitute cleaning in <br /> 30 accordance with SSPC-SP 15, Commercial Grade Power Tool Cleaning. <br /> 31 <br /> 32 6-07.3(10)G Treatment of Pack and Rust Gaps ' <br /> 33 The second paragraph is revised to read: <br /> 34 <br /> 35 Pack rust forming a gap between steel surfaces of/16 to 1/4 inch shall be cleaned to a depth <br /> 36 of at least one half of the gap width. The gaps shall be cleaned and prepared in accordance <br /> 37 with SSPC-SP6. The cleaned gap shall be treated with rust penetrating sealer, prime <br /> 38 coated, and then caulked to form a watertight seal along the top edge and the two sides of <br /> 39 the steel pieces involved, using the rust penetrating sealer and caulk as accepted by the <br /> 40 Engineer. The bottom edge or lowest edge of the steel pieces involved shall not be <br /> 41 caulked. <br /> 42 <br /> 43 The third paragraph is supplemented with the following: <br /> 44 <br /> 45 Caulk shall be a single-component urethane sealant conforming to Section 9-08.7. <br /> 46 <br /> d7 The fifth paragraph is revised to read: <br /> 48 <br /> 49 At locations where gaps between steel surfaces exceed 1/4 inch, the Contractor shall clean <br /> 50 and prepare the gap in accordance SSPC-SP6, apply the rust penetrating sealer, apply the <br /> City of Everett Page AM-48 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.