My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 1 Section 6-16, Soldier Pile and Soldier Pile Tieback Walls <br /> 2 April 2, 2018 <br /> I3 6-16.2 Materials <br /> 4 In the first paragraph, the reference to "Aggregates for Portland Cement Concrete" is revised to <br /> 5 read: <br /> I6 <br /> 7 Aggregates for Concrete 9-03.1 <br /> 8 <br /> I9 Section 6-18, Shotcrete Facing <br /> 10 January 2, 2018 <br /> 11 6-18.3(3) Testing <br /> 12 In the last sentence of the first paragraph, "AASHTO T 24" is revised to read "ASTM C1604". <br /> 13 <br /> 14 6-18.3(3)B Production Testing <br /> 15 In the last sentence, "AASHTO T 24" is revised to read "ASTM C1604". <br /> 16 <br /> 17 6-18.3(4) Qualifications of Contractor's Personnel <br /> 18 In the last sentence of the second paragraph, "AASHTO T 24" is revised to read "ASTM C1604". <br /> I19 <br /> 20 Section 6-19, Shafts <br /> 21 January 7, 2019 <br /> I22 6-19.2 Materials <br /> 23 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 24 Cement Concrete" are revised to read: <br /> 1 25 <br /> 26 Cement 9-01 <br /> 27 Aggregates for Concrete 9-03.1 <br /> I 28 <br /> II 29 6-19.3(1)A Shaft Construction Tolerances <br /> 30 The last paragraph is supplemented with the following: <br /> 31 <br /> 32 The elevation of the top of the reinforcing cage for drilled shafts shall be within +6 inches <br /> 33 and -3 inches from the elevation shown in the Plans. <br /> I34 <br /> 35 6-19.3(2)D Nondestructive QA Testing Organization and Personnel <br /> 36 Item number 4 in the first paragraph is revised to read: <br /> I 37 <br /> 38 4. Personnel preparing test reports shall be a Professional Engineer, licensed under Title <br /> 39 18 RCW, State of Washington, and shall seal the report in accordance with WAC 196- <br /> 40 23-020. <br /> II41 <br /> 42 6-19.3(3)C Conduct of Shaft Casing Installation and Removal and Shaft <br /> 43 Excavation Operations <br /> I44 The first paragraph is supplemented with the following: <br /> 45 <br /> 46 In no case shall shaft excavation and casing placement extend below the bottom of shaft <br /> I47 excavation as shown in the Plans. <br /> 48 <br /> I <br /> City of Everett Page AM-63 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.