<br /> ' GENERAL NOTES
<br /> 1. THIS FACILITY IS EXEMPT FROM HANDICAP REQUIREMENTS PER 2015 INTERNATIONAL BUILDING CODE SECTION 1103.2.9.THIS FACILITY IS
<br /> NON-OCCUPIABLE SPACE AND ENTERED ONLY BY SERVICE PERSONNEL.THIS SPACE IS NOT FOR HUMAN OCCUPANCY. Sprint'>
<br /> 2. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO SUBMITTING HIS BID.ANY DISCREPANCIES,
<br /> CONFLICTS OR OMISSIONS SHALL BE REPORTED TO THE ENGINEER PRIOR TO SUBMITTING BIDS,AND PROCEEDING WITH ANY WORK
<br /> 3. THE CONTRACTOR SHALL NOTIFY ENGINEER OF ANY ERRORS,OMISSIONS,OR DISCREPANCIES AS THEY MAY BE DISCOVERED IN THE PLANS,
<br /> SPECIFICATIONS,B NOTES PRIOR TO STARTING CONSTRUCTION.INCLUDING BUT NOT LIMITED BY DEMOLITION.THE CONTRACTOR SHALL BE ABBREVIATION DEFINITION ABBREVIATION DEFINITION ABBREVIATION DEFINITION
<br /> RESPONSIBLE FOR CORRECTING ANY ERRORS,OMISSION,OR INCONSISTENCY AFTER THE START OF CONSTRUCTION WHICH HAS NOT BEEN
<br /> BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER AND SHALL INCUR ANY EXPENSES TO RECTIFY THE SITUATION.THE METHOD OF
<br /> CORRECTION SHALL BE APPROVED BY THE ARCHITECT OR THE ENGINEER RESPONSIBLE OF THE PROJECT.
<br /> A.B. ANCHOR BOLT FAB. FABRICATION(OR) PWR. POWER(CABINET)
<br /> 4. PRIOR TO STARTING CONSTRUCTION,THE CONTRACTOR HAS THE RESPONSIBILITY TO LOCATE ALL EXISTING UTILITIES,WHETHER OR NOT ABV. ABOVE F.F. FINISH FLOOR QTY. QUANTITY PLANS PREPARED BY:
<br /> SHOWN ON THE PLANS,AND TO PROTECT THEM FROM DAMAGE.THE CONTRACTOR OR SUBCONTRACTOR SHALL BEAR THE EXPENSE OF ACCA ANTENNA CABLE COVER ASSEMBLY F.G. FINISH GRADE RAD.(R) RADIUS
<br /> REPAIRING OR REPLACING ANY DAMAGE TO THE UTILITIES CAUSED DURING THE EXECUTION OF THE WORK.CONTACT USA DIG ALERT@ ADD'L ADDITIONAL FIN. FINISH(ED) REF. REFERENCE
<br /> 800-227-2600 A.F.F. ABOVE FINISHED FLOOR FLR. FLOOR REINF. REINFORCEMENT(ING)
<br /> A.F.G. ABOVE FINISHED GRADE FDN. FOUNDATION REQ'D. REQUIRED
<br /> 5. PRIOR TO STARTING CONSTRUCTION,THE CONTRACTOR SHALL PROTECT ALL AREAS FROM DAMAGE WHICH MAY OCCUR DURING ALUM. ALUMINUM " F.O.C. FACE OF CONCRETE RGS. RIGID GALVANIZED STEEL
<br /> CONSTRUCTION.ANY DAMAGE TO PROPOSED OR EXISTING SURFACES,STRUCTURES OR EQUIPMENT SHALL BE IMMEDIATELY REPAIRED OR ALT. ALTERNATE F.O.M. FACE OF MASONRY RRU. RADIO REMOTE UNIT
<br /> REPLACED TO THE SATISFACTION OF THE PROPERTY OWNER.THE CONTRACTOR SHALL BEAR THE EXPENSE OF REPAIRING OR REPLACING ANT. ANTENNA F.O.S. FACE OF STUD SCH. SCHEDULE Technology it Associates
<br /> ANY DAMAGED AREAS. APPRX. APPROXIMATE(LY) F.O.W. FACE OF WALL SHT. SHEET
<br /> ARCH. ARCHITECT(URAL) F.S. FINISH SURFACE SIM. SIMILAR
<br /> 6. A COPY OF THE APPROVED PLANS SHALL BE KEPT IN A PLACE SPECIFIED BY THE GOVERNING AGENCY,AND BY LAW SHALL BE AVAILABLE FOR AWG. AMERICAN WIRE GAUGE FT.(') FOOT(FEET) SPEC. SPECIFICATION(S)
<br /> INSPECTION AT ALL TIMES.IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALL CONSTRUCTION SETS REFLECT THE SAME BLDG. BUILDING FTG. FOOTING SQ. SQUARE
<br /> INFORMATION AS THE APPROVED PLANS.THE CONTRACTOR SHALL ALSO MAINTAIN ONE SET OF PLANS AT THE SITE FOR THE PURPOSE OF BLK. BLOCK G. GROWTH(CABINET) S.S. STAINLESS STEEL
<br /> DOCUMENTING ALL AS-BUILT CHANGES,REVISIONS,ADDENDA,OR CHANGE ORDERS.THE CONTRACTOR SHALL FORWARD THE BLKG. BLOCKING GA. GAUGE STD. STANDARD
<br /> AS-BUILT/HIRED DRAWINGS TO THE ARCHITECT OR THE ENGINEER RESPONSIBLE OF THE PROJECT AT THE CONCLUSION OF THE PROJECT. BM. BEAM GI. GALVANIZE(D) STL. STEEL
<br /> PNWMARKETOFFICE
<br /> 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE THE WORK ISINPROGRESS UNTIL THE JOB IS B.N. BOUNDARY NAILING G.F.I. GROUND FAULT CIRCUIT INTERRUPTER STRUC. STRUCTURAL 650 SOUTH ORCAS STREET#R-103
<br /> COMPLETE. BTCW. BARE TINNED COPPER WIRE GLB.(GLU-LAM) GLUE LAMINATED BEAM TEMP. TEMPORARY SEATTLE,WA 98108
<br /> B.O.F. BOTTOM OF FOOTING GPS GLOBAL POSITIONING SYSTEM THK. THICK(NESS)
<br /> 8. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE TEMPORARY POWER,WATER,AND TOILET FACILITIES AS REQUIRED BY THE PROPERTY BM BACK-UP CABINET GRND. GROUND TMA TOWER MOUNTED AMPLIFIER
<br /> OWNER OR GOVERNING AGENCY. CAB. CABINET HDR. HEADER T.N. TOENAIL
<br /> CANT. CANTILEVER(ED) HGR. HANGER T.O.A. TOP OF ANTENNA
<br /> 9. ALL CONSTRUCTION THROUGH THE PROJECT SHALL CONFORM TO THE LATEST I.B.C.AND ALL OTHER GOVERNING CODES,INCLUDING THE C.I.P. CAST IN PLACE HT. HEIGHT T.O.C. TOP OF CURB
<br /> THE MOST RESTRICTIVE CODE SHALL GOVERN. CLG. CEILING ICGB. ISOLATED COPPER GROUND BUS T.O.F. TOP OF FOUNDATION
<br /> CLR. CLEAR IN.(-) INCH(ES) T.O.P. TOP OF PLATE(PARAPET)
<br /> if 3
<br /> 10. THE CONTRACTOR AND SUBCONTRACTOR SHALL COMPLY WITH ALL LOCAL AND STATE REGULATIONS INCLUDING ALL OSHA REQUIREMENTS. COL. COLUMN INT. INTERIOR T.O.S. TOP OF STEEL PROPRIETARY INFORMATION
<br /> CONC. CONCRETE LB.(#) POUND(S) T.O.W. TOP OF WALL
<br /> 11. WHEN REQUIRED STORAGE OF MATERIALS OCCURS,THEY SHALL BE EVENLY DISTRIBUTED OVER THE FLOOR OR ROOF SO AS NOT TO CONN. CONNECTION(OR) L.B. LAG BOLTS TYP. TYPICAL THE INFORMATION CONTAINED IN THIS SET
<br /> EXCEED THE DESIGNED LIVE LOADS FOR THE STRUCTURE.TEMPORARY SHORING OR BRACING SHALL BE PROVIDED WHERE THE STRUCTURE CONST. CONSTRUCTION L.F. LINEAR FEET(FOOT) U.G. UNDER GROUND OF DRAWINGS IS PROPRIETARY 8 CONFIDENTIAL
<br /> OR SOIL HAS NOT ATTAINED THE DESIGN STRENGTH FOR THE CONDITIONS PRESENT. CONT. CONTINUOUS L. LONG(ITUDINAL) U.L. UNDERWRITERS LABORATORY TO SPRINT ANY USE OR DISCLOSURE OTHER THAN
<br /> d PENNY(NAILS) MAS. MASONRY U.N.O. UNLESS NOTED OTHERWISE AS IT RELATES TOSPRAT IS STRICTLY PROHIBITED
<br /> 12. THE CONTRACTOR SHALL SUPERVISE AND COORDINATE ALL WORK,USING HIS PROFESSIONAL KNOWLEDGE AND SKILLS.HE IS SOLELY DBL. DOUBLE MAX MAXIMUM V.I.F. VERIFY IN FIELD
<br /> RESPONSIBLE FOR ALL CONSTRUCTION MEANS,METHODS,TECHNIQUES,PROCEDURES AND SEQUENCING AND COORDINATING ALL DEPT. DEPARTMENT M.B. MACHINE BOLT W WIDE(WIDTH) PROJECT INFORMATION:
<br /> PORTIONS OF THEWORK UNDER THE PROJECT. D.F. DOUGLAS FIR MECH. MECHANICAL W/ WITH
<br /> DIA. DIAMETER MFR. MANUFACTURER WO. WOOD
<br /> 13. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN AND PAY FOR ALL PERMITS,LICENSES AND INSPECTIONS WITH RESPECT TO THE DIAG. DIAGONAL MIN. MINIMUM W.P. WEATHERPROOF
<br /> WORK TO COMPLETE THE PROJECT.BUILDING PERMIT APPLICATIONS SHALL BE FILED BY THE OWNER OR AUTHORIZED AGENT.CONTRACTOR DIM. DIMENSION MISC. MISCELLANEOUS WT. WEIGHT
<br /> SHALL OBTAIN THE PERMIT AND MAKE FINAL PAYMENT OF SAID DOCUMENT. DWG. DRAWING(S) MTL. METAL 8 CENTERLINE
<br /> DIMEL DOWEL(S) €NN.T.(9) NUMBER NEW C PLATE COLLEGE
<br /> 14. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALE.DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCES. EA. EACH
<br /> EL. ELEVATION N.T.S. NOT TO SCALE
<br /> 15. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING,BACKING,FRAMING,HANGERS OR SUPPORTS FOR INSTALLATION OF ITEMS ELEC. ELECTRICAL O.C. ON CENTER
<br /> INDICATED ON THE DRAWINGS. ELEV. ELEVATOR OPNG. OPENING
<br /> EMT. ELECTRICAL METALLIC TUBING P/C PRECAST CONCRETE PLAZA
<br /> 16. THE CONTRACTOR SHALL PROVIDE THE FIRE MARSHALL OR U.L APPROVED MATERIALS TO FILL/SEAL PENETRATIONS THROUGH FIRE RATED E.N. EDGE NAIL PCS PERSONAL COMMUNICATION SERVICES
<br /> ASSEMBLIES. ENG. ENGINEER PLY. PLYWOOD
<br /> 17. PROPOSED CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL BE MATCHED IN FORM,TEXTURE,MATERIAL AND PAINT COLOR EQ. EQUAL PPC POWER PROTECTION CABINET
<br /> EXCEPT AS NOTED IN THE PLANS. EXP. EXPANSION PRC PRIMARY RADIO CABINET A
<br /> EXTT.(E) EXISTING P.S.F. POUNDS PER SQUARE FOOT SE54XC090
<br /> 18. THECONTRACTORISOFHEC TO PROVIDE PORTABLE FIRE EXTINGUISHERS HAVING A MINIMUM 2A,10-&C RATING WITHIN 75FT.OF TRAVEL TO ALL EXT. DUSTINEXTERIOR P.S.I. POUNDS PER SQUARE INCH
<br /> PORTIONS OF THE CONSTRUCTION AREA. P.T. PRESSURE TREATED
<br /> (2015 INTERNATIONAL BUILDING CODE 906.1.1 AND SECTION 906.3.1) 2605 15TH STREET
<br /> 19. MATERIALS TESTING SHALL BE TO THE LATEST STANDARDS AVAILABLE AS REQUIRED BY THE LOCAL GOVERNING AGENCY RESPONSIBLE FOR
<br /> APPROVING THE RESULTS.
<br /> EVERETT,WA 98201
<br /> 20. ALL GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM REQUIREMENTS TO BE USED IN CONDITIONS WHICH ARE NOT SPECIFICALLY
<br /> SHOWN OTHERWISE
<br /> 21. ALL DEBRIS AND REFUSE IS TO BE REMOVED FROM THE PROJECT.PREMISES SHALL BE LEFT IN A CLEAN BROOM FINISHED CONDITION AT ALLTR F\/C C \
<br /> 22. BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS ARE TO BE NOTIFIED PRIOR TO ANY GRADING AND CONSTRUCTION EFFORT AS '"•ISIONS
<br /> MANDATED BY THE GOVERNING AGENCY. ABBREVIATIONS
<br /> REV. DATE DESCRIPTION BY
<br /> 23.ALL SYMBOLS AND ABBREVIATIONS ARE CONSIDERED CONSTRUCTION INDUSTRY STANDARDS.IF A CONTRACTOR HAS A QUESTION REGARDING
<br /> THEIR EXACT MEANING THE ARCHITECT OR THE ENGINEER RESPONSIBLE OF THE PROJECT SHALL BE NOTIFIED FOR CLARIFICATIONS. A 07/11/018 ISSUED FOR 80%CD REVIEW RKS
<br /> 24.SITE CONTRACTOR TO CALL DIG ALERT(1.800-227-2600)TO LOCATE ANY AND ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. 0 08/27/2018 ISSUED FOR 100%CD CMB
<br /> 25.ALL FACILITIES TO BE INSTALLED ARE UNMANNED.NO(E)PARKING SPACES WILL BE USED OR REMOVED BY THIS PROJECT.
<br /> 26.PRIOR TO THE ISSUANCE OF ANY CONSTRUCTION PERMITS,THE APPLICANT SHALL INCORPORATE ANY CONSTRUCTION BEST MANAGEMENT
<br /> PRACTICES NECESSARY TO COMPLY WITH THE CIMS MUNICIPAL CODES INTO THE CONSTRUCTION PLANS OR SPECIFICATIONS.
<br /> 27.PRIOR TO THE ISSUANCE OF ANY CONSTRUCTION PERMITS,THE APPLICANT SHALL SUBMIT A WATER POLLUTION CONTROL PLAN RPCP).THE 4 NEW ANTENNA O GRID REFERENCE - CENTERLINE
<br /> WPCP SHALL BE PREPARED IN ACCORDANCE WITH THE GUIDLINES IN APPENDIX E OF THE CITYS STORM WATER STANDARDS.
<br /> Q EXISTING ANTENNA N© PROPERTY/LEASE LINE
<br /> 28.THIS PROJECT PROPOSES NO DEVELOPEMENT IMPROVEMENTS OUTSIDE THE EXISTING BUILDING FOOTPRINT FOR THIS DISCRETIONARY DETAIL REFERENCE
<br /> REVIEW AND THEREFORE DOES NOT REQUIRE ANY PERMANENT STORM WATER BEST MANAGEMENT PRACTICES.
<br /> 29.THIS INSTALLATION ON AN EXISTING FACILITY AND NO GROUND DISTURBANCE OR TRENCHING IS PROPOSED BY THIS PROJECT. ® GROUND ROD MATCH LINE
<br /> 30.THIS PROJECT PROPOSES NO WORK WITHIN THE PUBLIC RIGHT-OF-WAY. Ark
<br /> ELEVATION REFERENCE NI* J
<br /> -1-r GROUND BUS BAR WORK POINT LICENSURE:
<br /> STORM WATER QUALITY NOTES CONSTRUCTION BMPS:
<br /> THIS PROJECT SHALL COMPLY WITH ALL REQUIREMENTS OF THE STATE PERMIT. • MECHANICAL GRND.CONN. 0 I SECTION REFERENCE GROUND CONDUCTOR ^�
<br /> NOTES 1.8 BELOW REPRESENT KEY MINIMUM REQUIREMENTS FOR CONSTRUCTION BMP'S. scO( =J+
<br /> 1.SUFFICIENT BMPS MUST BE INSTALLED TO PREVENT SILT,MUD OR OTHER CONSTRUCTION DEBRIS FROM BEING TRACKED INTO THE ADJACENT STREET(S)OR STORM ■ CADWELD `•TAS <
<br /> 1 WATER CONVEYANCE SYSTEMS DUE TO CONSTRUCTION VEHICLES OR ANY OTHER CONSTRUCTION ACTIVITY.THE CONTRACTOR SHALL BE RESPONSIBLE FOR 6'-�"-_'-"*'-"'-.,N GROUT OR PLASTER T TELEPHONE CONDUIT OF V�' O
<br /> 6L CLEANING ANY SUCH DEBRIS THAT MAY BE IN THE STREET AT THE END OF EACH WORK DAY OR AFTER A STORM EVENT THAT CAUSES A BREECH IN THE INSTALLED -
<br /> p CONSTRUCTION BMPS. GROUND ACCESS WELL /�C�Y1j I ! C� fes'
<br /> [S 1 I (/)BRICK '^V L�� ••' -1, 0 '',.4J
<br /> 2.ALL STOCK PILES OF UNCOMPACTED SOIL AND/OR BUILDING MATERIALS THAT ARE INTENDED TO BE LEFT UNPROTECTED FORA PERIOD GREATER THAN SEVEN E ELECTRICAL CONDUIT r-' Sz'}j'= +x
<br /> CALENDER DAYS ARE TO BE PROVIDED WITH EROSION AND SEDIMENT CONTROLS,SUCH SOIL MUST BE PROTECTED EACH DAY WHEN THE PROBABILITY OF RAIN IS 40% ❑E ELECTRIC BOX (POWER) W -�
<br /> OR GREATER ® (8)MASONRY h /, - '
<br /> a 3.A CONCRETE WASHOUT SHALL BE PROVIDED ON ALL PROJECTS WHICH PROPOSE THE CONSTRUCTION OF ANY CONCRETE IMPROVEMENTS THAT ARE TO BE POURED IN - A COAXIAL CABLE
<br /> PLACE ON THE SITE. TELEPHONE BOX F;::..,;'. •.. ,_,.I CONCRETE ",� ' 1r
<br /> 4.ALL EROSION/SEDIMENTPONTROL DEVICES SHALL BE MAINTAINED IN WORKING ORDER AT ALL TIMES. -I T/E - OVERHEAD SERVICE O ,55959
<br /> I 5.ALL SLOPES THAT ARE CREATED OR DISTURBED BY CONSTRUCTION ACTIVITY MUST BE PROTECTED AGAINST EROSION AND SEDIMENT TRANSPORT AT ALL TIMES. 0 LIGHT POLE EMEMTM EARTH CONDUCTORS �.s R'01ST'W
<br /> i 6.THE STORAGE OF ALL CONSTRUCTION MATERIALS AND EQUIPMENT MUST BE PROTECTED AGAINST ANY POTENTIAL RELEASE OF POLLUTANTS INTO THE ENVIRONMENT. `rjONAL0
<br /> n 0 FND.MONUMENT . 0 o 0 0 0 0 GRAVEL X CHAIN LINK FENCING
<br /> 1 GENERAL FIRE NOTES:
<br /> 1. BUILDINGS UNDERGOING CONSTRUCTION,ALTERATION,OR DEMOLITION SHALL BE IN ACCORDANCE WITH 2015 INTERNATIONAL BUILDING CODE AND ALL
<br /> $ SPOT ELEVATION ® PLYWOOD SHEET TITLE:
<br /> GOVERNING CODES.
<br /> Ili 2. ADDRESS SHALL BE PROVIDED FOR ALL PROPOSED AND EXISTING BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR Q SET POINT %'1-""r`l SAND GENERAL NOTES
<br /> k ROAD FRONTING THE PROPERTY.(2015 INTERNATIONAL BUILDING CODE 501.2) .L
<br /> 1 3. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT CONDITION.(2015 INTERNATIONAL BUILDING CODE 806.1) 1 REVISION 1 �1 WOOD CONT.
<br /> 4. PORTATRAVEL LE FIRE FOR EACH
<br /> H 6,000AQLEASTR FEFIRETOR EXTINGUPORTION THEREOF ON EACHMINIMUM RATINGOR.(20 OF 2-A-NATIO SHALL E PROVIDED WITHIN 75 ANDFEETSECTION
<br /> 9UM I\J WOOD BLOCKING
<br /> TRAVEL DISTANCE FOR EACH 6,000 SQUARE FEET OR PORTION THEREOF ON EACH BUILDINGFLOOR.(2015INTERNATIONALCODE 908.1.1 AND SECTION 908.3.1) ry.�✓��'vF) (,E SHEET NUMBER:
<br /> IS
<br /> V 5. VERIFY THAT ALL COMPONENTS OF 2015 IBC SECTION 3108 AND 2015 IFC CHAPTER 33 HAVE BEEN SATISFIED. STEEL 1N A
<br /> 1�1,�JP n
<br /> 6. VERIFY THAT ALL SAFETY SYSTEMS SHALL REMAIN OPERATIONAL DURING T.I.
<br /> 11 7. ALL FIRE ACCESS ROADS SHALL REMAIN OPEN DURING CONSTRUCTION AND HYDRANTS OPERATIONAL. T-3
<br /> 1, GENERAL NOTES 1 LEGEND 3