My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2605 15TH ST SPRINT ANTENNA 2019-07-09
>
Address Records
>
15TH ST
>
2605
>
SPRINT ANTENNA
>
2605 15TH ST SPRINT ANTENNA 2019-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 11:19:50 AM
Creation date
7/9/2019 11:19:46 AM
Metadata
Fields
Template:
Address Document
Street Name
15TH ST
Street Number
2605
Tenant Name
SPRINT ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
xe 1 <br /> GENERAL GROUNDING NOTES: <br /> 1. ALL DETAILS ARE SHOWN IN GENERAL TERMS.ACTUAL INSTALLATION <br /> s AND CONSTRUCTION MAY VARY DUE TO SITE SPECIFIC CONDITIONS. print' <br /> 2. GROUND ALL ANTENNA BASES.FRAMES,CABLE RUNS,AND OTHER <br /> METALLIC COMPONENTS USING GROUND WIRES AND CONNECT TO <br /> SURFACE MOUNTED BUS BARS.FOLLOW ANTENNA AND BTS <br /> MANUFACTURERS PRACTICES FOR GROUNDING REQUIREMENTS. <br /> GROUND COAX SHIELD AT BOTH ENDS AND EXIT FROM TOWER OR <br /> POLE USING MFRS PRACTICES. <br /> 3 ALL GROUND CONNECTIONS SHALL BE EXOTHERMIC.ALL WIRES PLANS PREPARED BY: <br /> SHALL BE COPPER THHN/TH WN.ALL GROUND WIRE SHALL BE GREEN <br /> INSULATED WIRE ABOVE GROUND. <br /> 4. CONTRACTOR TO VERIFY AND TEST GROUND TO SOURCE. <br /> GROUNDING AND OTHER OPERATIONAL TESTING WILL BE WITNESSED l„ <br /> BY SPRINT REPRESENTATIVE <br /> 5. REFER TO DIVISION 18 GENERAL ELECTRIC.GENERAL ELECTRICAL Technology"wAssociates <br /> PROVISION AND COMPLY WITH ALL REQUIREMENTS OF GROUNDING <br /> STANDARDS. <br /> 6. ELECTRICAL CONTRACTOR TO PROVIDE DETAILED DESIGN OF PNW MARKET OFFICE <br /> GROUNDING SYSTEM PER SPRINT STANDARD GROUNDING METHOD. 650 SOUTH ORCAS STREET#R-103 <br /> AND RECEIVE APPROVAL OF DESIGN BY AUTHORIZED SPRINT <br /> SEATTLE,WA 98108 <br /> REPRESENTATIVE.PRIOR TO INSTALLATION OF GROUNDING <br /> SYSTEM,PHOTO DOCUMENT ALL EXOTHERMIC AND GROUND RING. <br /> 7. NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY DIFFICULTIES <br /> INSTALLING GROUNDING SYSTEM DUE TO SITE SOIL CONDITIONS. <br /> 8. ALL EXISTING GROUND BARS,WIRES&CONNECTIONS SHALL BE FIELD PROPRIETARY INFORMATION <br /> VERIFIED.ANY DEFICIENT ITEMS SHALL BE REPLACED AS REQUIRED <br /> TO ACHIEVE ADEQUATE GROUNDING REQUIRED BY SPRINT. <br /> THE INFORMATION CONTAINED IN THIS SET <br /> OF DRAWINGS IS PROPRIETARY B.CONFIDENTIAL <br /> GROUNDING NOTES: TO SPRINT ANY USE OR DISCLOSURE OTHER THAN <br /> AS IT RELATES TO SPRINT IS STRICTLY PROHIBITED N. <br /> 1. EXOTHERMIC WELDS(2)2 AWG BARE TINNED SOLID COPPER <br /> CONDUCTORS TO GROUNDING BAR.ROUTE CONDUCTORS TO BURIED PROJECT INFORMATION: <br /> GROUNDING RING AND PROVIDE PARALLEL EXOTHERMIC WELD. <br /> 2 G.C.SHALL USE PERMANENT MARKER TO DRAW THE LINES BETWEEN <br /> EACH SECTION AND LABEL EACH SECTION Cr.'A'.'N N.T)WITH 1' <br /> HIGH LETTERS. `,. <br /> 3. ALL HARDWARE 18-8 STAINLESS STEEL,INCLUDING LOCK WASHERS, \ <br /> COLLEGE <br /> COAT ALL SURFACES WITH AN ANTI-OXIDANT COMPOUND BEFORE - <br /> MATING.ALL HARDWARE SHALL BE STAINLESS STEEL 3/8 INCH ww <br /> DIAMETER OR LARGER. ' 79 �. // PLAZA <br /> LA 7 A <br /> 4. FOR GROUND BOND TO STEEL ONLY:INSERT A CADMIUM FLAT 0 -�- L„ <br /> WASHER BETWEEN LUG AND STEEL,COAT ALL SURFACES WITH AN ' <br /> ANTI-OXIDANT COMPOUND BEFORE MATING. a��G ('1�F X Q <br /> 5. NUT&WASHER SHALL BE PLACED ON THE FRONT SIDE OF THE � ✓ SE54 `CO9O <br /> GROUNDING BAR AND BOLTED ON THE BACK SIDE.INSTALL BLACK 2605 15TH STREET <br /> HEAT-SHRINKING TUBE,800 VOLT INSULATION ON ALL GROUNDING <br /> TOMPINAT ONSC EINNNTE NIS TO WEATHERPROOF THE EVERETT, WA 98201 <br /> 8. NUMBER OF GROUNDING BARS MAY VARY DEPENDING ON THE TYPE • <br /> OF TOWER,ANTENNA LOCATION.AND CONNECTION ORIENTATION. •T " <br /> PROVIDE AS REQUIRED. <br /> 7. GROUNDING KIT SHALL BE TYPE AND PART NUMBER AS SUPPLIED OR `2 REVISIONS <br /> RECOMMENDED BY CABLE MANUFACTURER. EXISTING SPRINT ANTENNA GROUND <br /> ®BAR.FIELD VERIFY LOCATION(TYP) ��C \ REV. DATE DESCRIPTION BY <br /> 8. WEATHERPROOFING SHALL BE TYPE AND PART NUMBER AS SUPPLIED �"� <br /> A 07/11/2018 ISSUED FOR 90%CD REVIEW RKS <br /> OR RECOMMENDED BY CABLE MANUFACTURER. ©NEW#2 AWG(AS REQUIRED) ---------__ ,\ 0 08/27/2018 ISSUED FOR 100%CD C.':'6 <br /> 9. WEATHERPROOFING SHALL BE SUPPLIED AND INSTALLED BY <br /> ®FROM PIPE TO GROUND BAR(TYP) <br /> CONTRACTOR. m EXOTHERMIC WELD(AS REQUIRED) -------_ ,,b <br /> _O <br /> 10. WHEN THE SCOPE OF WORK REQUIRES THE ADDITION OF A ®ANTENNA MOUNTING PIPE(TYP.) -- <br /> GROUNDING BAR TO AN EXISTING TOWER,THE SUBCONTRACTOR <br /> SHALL OBTAIN APPROVAL FROM THE TOWER OWNER PRIOR TO <br /> MOUNTING THE GROUNDING BAR TO THE TOWER. \` NEW#B AWG FROM RRU©® <br /> \ 0- TOGROUND BAR(TYP) ®® <br /> 11. EXTEND TWO(2)2 AWG TINNED CU CONDUCTOR FROM BURIED `\ 0 9� <br /> GROUNDING RING AND CONNECT TO THE NEW TOWER.FOLLOW <br /> 1 - -MECHANICAL LUG CONNECTION(TYP.) <br /> MANUFACTURERS RECOMMENDATIONS FOR GROUNDINGWY <br /> CONNECTIONS TO THE TOWER.(APPLICABLE TO NEW TOWERS ONLY.) o <br /> 12. NUMBER OF GROUNDING BARS MAY VARY DEPENDING ON THE TYPE \ - <br /> OF TOWER,ANTENNA LOCATION,AND CONNECTION ORIENTATION LICENSURE: <br /> THE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING \ <br /> ADDITIONAL GROUNDING BARS AS REQUIRED,PROVIDING 50%SPARE <br /> CONNECTION POINTS. <br /> SC OTT^ <br /> 13. EXPOSED GROUND WIRES TO BE NON METALLIC LIQUID TIGHT. �`vt+ V <br /> R �7 <br /> .ir <br /> a <br /> LEGEND <br /> 4 <br /> ■ EXOTHERMIC CONNECTION r4 REr 5959�� ' <br /> • MECHANICAL CONNECTION �P. SS1()\ �:14C', <br /> 22 <br /> EQUIPMENT GROUND BAR <br /> & F,"..^^T.'T!. ANTENNA GROUND BAR(AS REQUIRED) SHEET TITLE: <br /> R II1- #2 AWG GROUND LEAD(AS REQUIRED) C <br /> GROUNDING PLANS <br /> A ®� SHEET NUMBER: <br /> fig( NOTE: <br /> 1 �/ <br /> 1 CONTRACTOR TO REPLACE ALL MISSING GROUND BARS a 1'- <br /> it AND GROUNDING CONNECTIONS AS REWIRED. <br /> G. 1 <br /> `NOTES & LEGEND N.T.S. 1 ANTENNA GROUNDING (FINAL) N.T.S. 2 / J <br />
The URL can be used to link to this page
Your browser does not support the video tag.