My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2113 - 8 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> 1.22 BIDDER'S CHECK LIST <br /> A. The Bidder's attention is especially called to the following forms that must be executed <br /> in full as required and submitted with the Bid. <br /> 1. Bid: Show the lump sum and unit price items in the space provided on the Bid <br /> Form. <br /> 2. Bid Signature Sheet: To be filled in and signed by the Bidder. <br /> 3. Subcontractors Form: To be filled in by the Bidder. <br /> 4. Bid Security: This form is to be executed by the Bidder and the surety company <br /> unless Bid is accompanied by a certified or cashier's check. The amount of the1 <br /> bond or cashier's check, which shall be not less than five percent of the Total Bid <br /> Amount bid, may be shown in dollars or on a percentage basis. <br /> 5. Disadvantaged/Women's Business Enterprise: To be filled in and signed by the <br /> Bidder. <br /> 6. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br /> B. Failure to complete and fully execute the aforementioned forms and to submit them with t <br /> the Bid may result in rejection of Bid. <br /> C. The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful Bidder in duplicate within <br /> 14 calendar days after the award date. <br /> 2. Payment and Performance Bond: This form is to be executed by the successful <br /> Bidder and his surety company in triplicate. The amount of these bonds shall be <br /> 100 percent of the Total Bid Amount and shall be submitted with the Contract. <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained <br /> and maintained in force in accordance with SECTION 007200. Part 15 "Liability <br /> and Insurance", of the Contract Documents. <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must <br /> file with each bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit <br /> of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to <br /> the Subcontractor shall be submitted to the Employment Standards Division, State <br /> Department of Labor and Industries, Olympia, Washington. If the prime contract <br /> is over$1,000,000, then Contractor also needs to submit L&I Form F700-164-000 <br /> (Affidavit of Wages Paid EHB 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br /> WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll <br /> Form WH347) may use State of Compliance found on back of form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). Contractors, <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall <br /> attach the Statement of Compliance Form WH 348 to each payroll. <br /> 111 <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors <br /> on a form provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section 007200, <br /> Part 5 "Progress and Completion", of the Contract Documents by the Contractor <br /> within ten calendar days, or such time as determined by the City, after the date of <br /> receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's <br /> Design and Construction Standards. If, and to the extent, such plans are not <br /> sufficient, complete or adequate to support the Bidder's planned means and <br /> 00 2113 - 8 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.