My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200 -43 <br /> 2019 Biosolids Removal UT3705-2 <br /> v. Overhead(general and administrative). <br /> vi. Subcontractor's contract claims (in the same level of detail as specified herein is <br /> ' required for all Subcontractor's contract claims); and <br /> vii. Other categories as specified by the Contractor or the Owner. <br /> ' 10. A notarized statement shall be submitted to the Owner's Representative containing the following <br /> language: <br /> Under the penalty of law for perjury or falsification,the undersigned, <br /> 1 <br /> (name) (title) <br /> of <br /> ' (company) <br /> hereby certifies that the Contract Claim for extra compensation and extension of Contract <br /> ' Time, if any, made herein for Work on this Contract is a true and complete statement of <br /> the factual basis of the Contract Claim and all actual costs incurred and time sought, and <br /> is fully documented and supported under the Contract between the parties. <br /> ' Date /s/ <br /> Subscribed and sworn before me this day of <br /> ' Notary Public <br /> My Commission Expires: <br /> ' 12.3 FALSE OR OMITTED INFORMATION <br /> The Contractor waives each Contract Claim for which it presents material information that it knows, or in <br /> ' the exercise of reasonable care should know, is false, or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees <br /> and expenses incurred in investigating any such Contract Claim. <br /> 12.4 REMEDIES <br /> 12.4.1 General <br /> ' If a Contract Claim has merit in whole or in part,then Contractor's sole remedies shall be those provided <br /> in this subsection. Contractor must timely and strictly comply with the requirements of 10.NOTICE TO <br /> OWNER, 12. CONTRACT CLAIMS and all other General Conditions relating to the Contract Claim. <br /> Adjustments to Contract Time shall be determined pursuant to 5.2.2.2 Extensions of Contract Time. <br /> Failure to comply strictly and timely shall be deemed a waiver of the Contract Claim. <br /> 12.4.2 Extra Work <br /> ' 12.4.2.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work,the adjustment shall <br /> be calculated and paid as provided in 9.5.ADJUSTMENT OF CONTRACT SUM. This amount <br /> includes jobsite and home office Overheads for such Work, including any schedule delays relating to such <br /> Work. Therefore,no compensation in addition to that provided in 9.6.FORCE ACCOUNT shall be <br /> paid for such thing as extended Overhead or other costs or damages. <br /> ' 00 7200 -43 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.