<br /> 2019 Biosolids Removal UT3705-2
<br /> The City of Everett Utilities Department has reviewed and commented on the Drawings in this Contract.
<br /> If an erosion control plan is required,the Contractor shall submit an erosion control plan that depicts the
<br /> ' best management practices that will be followed for erosion control. The Contractor may use the plans in
<br /> this Contract. The fee for this permit will be waived by the City of Everett.
<br /> Electrical permits can be obtained at:
<br /> ' City of Everett
<br /> 3200 Cedar Street—2nd Floor
<br /> Everett, WA 98201
<br /> Phone: 425/257-8800
<br /> 16.3 PATENTS AND ROYALTIES
<br /> Costs involved in fees, royalties, or claims for any patented invention, article,process or method that may
<br /> be used upon or in a manner connected with the Work under this Contract or with use of completed Work
<br /> by the Owner shall be paid by the Contractor. The Contractor and its sureties shall protect and hold the
<br /> ' Owner, Owner's Representative, and Owner's Representative,together with its officers, agents, and
<br /> employees,harmless from any and all loss,defense cost, and expenses and against any and all demands
<br /> made for such fees or claims brought or made by the holder of any invention or patent. Before final
<br /> payment is made on the account of this Contract,the Contractor shall, if requested by the Owner, furnish
<br /> ' acceptable proof of a proper release from all such fees or claims.
<br /> Should the Contractor, its agent, employee or any of them be enjoined from furnishing or using any
<br /> invention, article,material or plans supplied or required to be supplied or used under this Contract,
<br /> Contractor shall promptly pay such royalties and secure requisite licenses; or, subject to acceptance by
<br /> Owner, substitute other articles, materials, or appliances in lieu thereof that are of equal efficiency,
<br /> ' quality, finish, suitability and market value to those planned or required under the Contract. Descriptive
<br /> information of these substitutions shall be submitted to the Owner's Representative for determination of
<br /> general conformance to the design concept and the construction Contract. Should Owner elect to refuse
<br /> the substitution, Contractor agrees to pay such royalties and secure such valid licenses as may be requisite
<br /> for the Owner, its officers, agents and employees or any of them,to use such invention, article, material
<br /> or appliance without being disturbed or in any way interfered with by any proceeding in law or equity on
<br /> ' account thereof.
<br /> 17. AUDITS
<br /> 17.1 GENERAL
<br /> The Contractor's records relating to this Project, including,but not limited to,wage, payroll, and cost
<br /> records, shall be open to inspection or audit by representatives of the Owner during the Project and for a
<br /> period of not less than six years after the date of Final Acceptance of the Contract. The Contractor shall
<br /> retain these records for that period. The Contractor shall also guarantee that Project records of
<br /> ' Subcontractors, Suppliers, and lower tier Subcontractors, including, but not limited to,the wage, payroll,
<br /> and cost records, shall be retained and open to similar inspection or audit for the same period of time.
<br /> The audit may be performed by employees or representatives of the Owner or by an auditor chosen by the
<br /> Owner. The Contractor, Subcontractors, or lower tier Subcontractors shall provide adequate facilities,
<br /> ' reasonably acceptable to auditor, for the audit during normal business hours. The Contractor,
<br /> Subcontractors, or lower tier Subcontractors shall make a good faith effort to cooperate with the auditors.
<br /> If an audit is to be commenced more than sixty(60)days after the Final Acceptance date of the Contract,
<br /> the Contractor will be given twenty(20)days' notice of the time when the audit is to begin. If any
<br /> litigation, claim, or audit arising out of, in connection with, or related to this Contract is initiated,the
<br /> Project records shall be retained until the later of(a)completion of litigation, claim, or audit or(b) six
<br /> years after the date of Final Acceptance.